Laserfiche WebLink
-258- <br /> <br />1.07 <br /> <br />1.08 <br /> <br />1.09 <br /> <br />1.I0 <br /> <br />1.11 <br /> <br />1.I2 <br /> <br /> HAaNDLING OF MATERIALS AND EQUIPMENT: <br />A. The contractor shall provide and pay for all transportation required to delix;er and remove <br /> from the site' all materials and equipment required for all the work shown and specified. <br /> <br /> CONTRACTORS RESP~)NSIBILITY: <br />A. The Contractor shall be responsible for his work and for all materials, tools, and <br /> property of every description used in connection. <br /> B. .. The Contractor shall protect the Owner against all liabilities, claims, or demandi for <br /> injuries or damages to any persons or property growing out of the performance of the <br /> work under this contract,-.except such liability, claims or demands for injuri.es.'or damages <br /> re~ilting from acts or failure to act by the Owner. <br /> <br /> WORK BY'OTHERS: <br /> N.A. .. '. <br /> <br /> CODES AND INSPECTION: <br />A. The entire installation shall fully comply with all local, state laws and ordinances, and <br /> with all the established codes applicable thereto. The Contractor shall be responsible for <br /> all required permits, and arrange for all necessary ~nspection and pay for any and all <br /> expenses in conjunction with the irrigation portion of the work. <br /> <br />FIELD M~;ASIJl~'MENTS: <br />A:. 'i.' '5 ~erify:that field measurements are is shown on shop drawings and that area within h'rrfits · ." ' . a~e 100% covered. <br /> <br />CLEANING PRocEss: <br />A. · The contractor shall at al1 times keep the: premises on which the work is being done, and <br /> the adjoining premises, clean of rubbish caused by his work. <br />B. Upon completion of the job, the Contractor shall clean up all debris caused by his work <br /> and leave the job in a neat and clean condition. All debris from the job shall be taken:' <br /> away from the premises -:' <br /> <br />PART 2 - PRODUCTS <br /> <br /> All materials shall be new, first class, especially designed for the intended use. <br /> <br />2101 "-PRODUCTS: '..~. <br /> <br />2.02 <br /> <br />L.R. NELSON Irrigation Products <br /> <br />PIPING: <br />A. Pressure Main Piping on the supply side of the zone valves shall be class 160 PVC, as <br /> indicated in drawings. Fittings shall be solvent welded, schedule 40 socket type PVC, <br /> rated for pressure applications. All Solvent cement shall meet ANSI/ASTM B2564 for <br /> PVC pipe and fittings. <br />B. Lateral piping on zones #t through #7 shall be 100 psi rated polyethylene. Fittings shall <br /> be insert type secured with all stainless steel clamps. <br />C. Lateral piping on zones #8 through #11 shall be Class 160.P.V. C, solven.t:weld, bell end... '" <br /> Fittings shall be solvent welded, socket type sched~le 40,,rated for pressure applications. <br /> <br />D: .". '.. Piping for drinking fountain water supply, (alteimate'2); sl~'a'll be 1" polyethylene, 100 psi, <br /> "" "' NSF rated. --- '-- " ..... <br /> <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br /> <br /> <br />