My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 03/11/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:46:03 PM
Creation date
6/23/2003 1:54:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) <br /> <br />3) <br /> <br />Update on NPDES Phase II Implementation <br />The Public Works Committee recommended that the. City COunCil direct staff to prepare a <br />Storm Water Pollution Prevention Program for formal adoption. <br /> <br />Request for Extension of Sewer and Water <br />The Public Works Committee recommended that' the City Council authorize staff to hire <br />Bolten and Menk at a cost not to exceed $8,500, plus the cost of the lead contamination <br />consultant, for completing a feasibility study for extending urban services to the property <br />identified, contingent upon an escrow being set up to. cover all expenses including staff <br />time, the City not being held liable, amendment to the Sewer and water comprehensive <br />plan, and the City not having any liability to cover the feasibility study by drafting a <br />contract with the City Attorney, and contacting the MPCA regarding lead contamination <br />standards. <br /> <br />Principal City Engineer Olson stated that he did work with the City Attorney on drafting a <br />resolution that would address most of the issues discussed by the Public Works <br />Committee. The Council action would be for the City Council to adopt a resolution <br />authorizing the preparation of a feasibility study. <br /> <br />Councihnember Cook inquired if all the costs were covered in the resolution to assure <br />that the developer is paying them. <br /> <br />Principal City Engineer Olson explained that the City would be requiting $14,050 be <br />deposited with the City, and it is stated within the resolution that authorization of the <br />feasibility study does not attthorize the City to proceed with the project: <br /> <br />Councilmember Zimmerman stated that he thinks that the stUdy enCompasses a lot more <br />than feasibility because they would be extending sewer and water 2.3 miles into an area <br />that is not included in the Comprehensiv.e Plan for urban development. He felt that the <br />study was premature. <br /> <br />Councilmember Strommen inquired if the proposal from Golder Associates regarding the <br />lead contamination at the gun club would identify hot spots. <br /> <br />Principal City Engineer Olson explained that what might cOme out of the study would be <br />an inclusion in the feasibility study that hot spots have to be identified before any <br />construction can occur. <br /> <br />Councilmember Strommen stated that the issue of lead has a large impact on feasibility. <br />The concern she has is if they would be getting enough information fi.om the Phase I <br />study. <br /> <br />City Council/February 11, 2003 <br /> Page 9 of 14 <br /> <br />.31- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.