Laserfiche WebLink
BMP Description Sheet <br /> <br />MS4 Name: City of Ramsey <br /> <br />Unique Identifying Number: 4.C <br /> <br />Minimum Control Measures Addressed by This BMP <br /> <br />Public education & outreach <br /> Public participation & involvement <br /> Illicit discharge detection & elimination <br /> <br />Construction site runoff controls <br />Post-construction stormwater management <br />Pollution prevention/Good housekeeping <br /> <br />BMP Title: <br />Construction Site Staff Training <br /> <br />BMP Description: <br />The City of Ramsey will annually train Public Works and Engineerin'g personnel on what to look for <br />as potential sources of pollution at construction sites. <br /> <br />Measurable Goals: <br /> <br />· Completed meetings <br /> <br />Timeline / Implementation Schedule: <br /> <br />· Annually <br /> <br />Specific Components & Notes (optional): <br />· Erosion Control measures installed and maintained <br />· Communication link between Contractor and City <br />· Construction Site Inspection Program (4.A) <br />· Construction erosion and sedimentation control Ordinance (4.]3) <br /> <br />Responsible Person for this BMP -. ReSponsible Department or Organization <br />Name: Brian Olson <br /> <br />Title: Principal City Engineer <br />Phone: (763)42%1410 <br />E-mail: bolson@.qi.ramsey.mn.us <br /> <br />Dept. or Org.: Engineering <br />Dept. Head: <br /> <br />Phone: <br />E-mail: <br /> <br />Educational components related to this BMP (description or number- optional): <br /> <br />-134- <br /> <br />i <br />i <br />I <br /> <br /> <br />