Laserfiche WebLink
BMP Description Sheet <br /> MS4 Name: City of Ramsey <br /> <br /> Unique Identifying Number: 5.A <br /> <br /> Minimum Control Measures Addressed by This BMP <br /> <br />Public education & outreach ~-~ Construction site runoff controls <br /> Public participation & involvement ~ Post-construction stormwater management <br /> Illicit discharge detection & elimination Pollution prevention/Good housekeeping <br /> <br />BMP Title: <br />Surface Water Management Plan <br /> <br />BMP Description: <br />The City of Ramsey will update and implement a Surface Water Management plan consistent with <br />the goals of this SWPPP. This will be completed upon completion of the Storm Sewer System Map <br />(3.A) and Evaluate and Select B.MPs (5.A. 1) · <br /> <br />rV1easurable Goals: <br />· Completed Surface Water management Plan <br /> <br />Timeline/Implementation Schedule: <br /> <br />· March 2005- BMPs Selected <br />· March 2007 - Storm Sewer Map Completed <br />· March 2008- Completed Plan <br /> <br />Specific Components & Notes (optional): <br />· Storm Sewer System Map (3.A) <br />· Construction Site Inspection Program (4.A) <br /> · Construction erosion and sedimentation control Ordinance (4.B) <br /> · Evaluate and Select BMPs (5.A. 1) <br /> <br />Responsible Person for this BMP <br /> <br />Name: Brian Olson <br /> <br />Title: Principal City Engineer <br />Phone: (763)427-1410 <br />E-maih botson~ci.ramsey.mn, us <br /> <br />IResponsible Department or Organization <br /> Dept. or Or9.: Engineering <br /> Dept. Head: <br /> Phone: <br /> E-mail: <br /> <br />Educational components related to .this BMP ('description or number- optional): <br /> <br />-135- <br /> <br /> <br />