Laserfiche WebLink
BMP Description Sheet <br /> <br /> MS4 Name: City of Ramsey <br /> Unique Identifying Number: 5.A.1 <br /> Minimum Control Measures Addressed by This BMP <br /> <br />Public education & outreach ~ Construction site runoff controls <br /> Public participation & involvement ~ Post-construction stormwater management <br /> Illicit discharge detection & elimination Pollution prevention/Good housekeeping <br /> <br />BMP Title: <br />Evaluate and Select BM:Ps <br /> <br />BMP Description: <br />The City of Ramsey will evaluate and select the BMPs necessary t° achieve the balance between <br />water quality and water quantity to ensure that the waters of the community are clean and residents <br />and property is not damaged. <br /> <br />Evaluate innovative permanent structural storm sewer techniques to determine those that work the <br />best for the City of Ramsey and protection of our environment. <br /> <br />Measurable Goals: <br />· Meetings held to evaluate BMPs <br />· Selection of BMPs <br /> <br />Timeline/Implementation Schedule: <br /> <br />· March 2005- BMPs Selected <br /> <br />.Specific Components & Notes (optional): <br />· Construction erosion and sedimentation control Ordinance (4.B) <br /> <br />Responsible Person for this BMP <br /> <br />Name: Brian Olson <br /> <br />Title: Principal City Engineer <br />Phone: (763)427-1410 <br />E-mail: bo]son(.oJ~ci.ramsev.~.us <br /> <br />IResponsible Department or Organization <br /> Dept. or Or9.: Engineering <br /> Dept. Head: <br /> Phone: <br /> E-mail: <br /> <br />Educational components related to this BMP (description or number - optional): <br /> <br />-136- <br /> <br />I <br />I <br />I <br />I <br /> <br /> <br />