My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/19/2007
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2007
>
Agenda - Public Works Committee - 06/19/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:49:44 PM
Creation date
6/18/2007 7:49:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A POLICY ON THE CONSTRUCTION <br />AND MAINTENANCE OF LINED PONDS <br /> <br />Introduction <br /> <br />The utilization of storm water ponds has evolved into a basic element of subdivision <br />design. Many of the storm water ponds constructed within the City are constructed below <br />the water table making them normally wet ponds which provides an aesthetic benefit to <br />the subdivision. For those ponds which cannot be constructed into the water table there is <br />an increasing desire to achieve the aesthetic function of open surface water by installing <br />and impermeable lining for ponds which would otherwise be dryas a result of percolation <br />through the sandy soils. <br /> <br />Lined ponds may lose the integrity of their liner through improper installation or damage <br />to the liner by activities from property owners or builders. A significant problem <br />associated with the repair of breached liners is the identification of the defect location. In <br />addition, the repairs to the liner are usually costly. The City hereby establishes this policy <br />to safeguard the taxpayers and protect new property owners from the cost of pond liner <br />repaIr. <br /> <br />Installation <br /> <br />The City will take an active role during the installation of the pond liners by inspecting <br />the liner for conformance with the approved plans and specifications. The installation in <br />conformance to the plans and specifications shall be insured through an escrow or other <br />surety acceptable to the finance director in the amount of 125% of the estimated cost of <br />the pond liner. The surety shall be held through the installation period which shall be <br />until certificates of occupancy are issued to all properties riparian to the lined pond. <br /> <br />Maintenance <br /> <br />Following the installation period, any repair necessary shall be undertaken as a public <br />improvement project and special assessed to the riparian property owner following the <br />procedure set forth in section 4.60 of City Code. <br /> <br />Effective Date <br /> <br />This policy shall become effective upon adoption by City Council. <br /> <br />Adoption Date <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.