Laserfiche WebLink
CASE # 1 5 <br />CONSIDER AWARD BIDS FOR WELL HOUSE NO.4 <br />By: Leonard Linton, Civil Engineer II <br />Background: <br />The Comprehensive Water System Study was completed in 2004 to help the city <br />establish priorities, plan, fund and implement improvements to the Municipal water <br />supply system. The Study identified the need to add wells 7 and 8 to keep pace with the <br />demand as new homes are constructed and added to the system. <br />Wells 7 and 8 were authorized and being constructed at this time. Connection of the <br />wells to the municipal system requires construction of a Well House. The well house will <br />be constructed adjacent to Well No. 7 on which is located on the Fire Station No. 1 site <br />on Armstrong Boulevard. The Advertisement for Bids was approved at the May 22, 2007 <br />meeting. <br />The engineers estimate for the Project is $179,000. <br />The bids will be opened on June 26, 2007. The results and recommendation will be <br />distributed before the meeting. <br />Funding Source: <br />The funding source will be the Water Utility Fund. <br />Staff Recommendation:. <br />Staff recommends awarding the bid for construction of Well House No.4; contractor and <br />contract amount will be announced during the meeting (bid opening on 6/26). <br />Council Action: <br />Motion to award the bid for Well House No. 4; contractor and contract amount will be <br />announced during the meeting (bid opening on 6/26). <br />Reviewed by: <br />Finance Director <br />Interim City Administrator <br />Director of Public Works/ Principal City Engineer <br />CC: 6/26/07 <br />—351— <br />