Laserfiche WebLink
PAY ESTIMATE NO. 12 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />Date: June 8, 2007 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303 <br />RE: Sunwood Drive NW and Rhinestone Street NW <br />Contractor: Glenn Rehbein Companies <br />Contract Amount: $4,807,071.73* <br />Award Date: May 12, 2004 <br />Completion Date: October 15, 2005 ** <br />Dear Council Members: <br />The following work has been completed on the above referenced project. <br />ITEM <br />NO. <br />-YY <br />ITEM <br />QTY <br />.UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />PAVEMENT MARKING REMOVAL <br />5000 <br />LF <br />$0.41 <br />LF <br />$2,050.00 <br />5000 <br />$2,050.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />800 <br />SY <br />$1.35 <br />SY <br />$1,080.00 <br />770 <br />$1,039.50 <br />3 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />1060 1 <br />LF <br />$0.93 <br />LF 1 <br />$985.80 <br />666 <br />$619.38 <br />4 <br />COMMON EXCAVATION, EV <br />15200 <br />CY <br />$1.96 <br />CY <br />$29,792.00 <br />15200 <br />$29,792.00 <br />5 <br />SALVAGED TOPSOIL FROM STOCKPILE, SV <br />2250 <br />CY <br />$6.60 <br />CY <br />$14,850.00 <br />1350 <br />$8,910.00 <br />6 <br />SUBGRADE PREPARATION <br />57 <br />RD. ST. <br />$111.58 <br />RD.ST. <br />$6,360.06 <br />57 <br />$6,360.06 <br />7 <br />SALVAGE AND REINSTALL AGGREGATE SURFACE (LV) <br />620 <br />CY <br />$5.88 <br />CY <br />$5,505.60 <br />1320 <br />$11,721.60 <br />8 <br />AGGREGATE BASE CLASS 5 MODIFIED <br />13000 <br />TON <br />$9.06 <br />TON <br />$117,780.00 <br />13198 <br />$119,573.88 <br />9 <br />CONCRETE PAVEMENT <br />18500 <br />SY <br />$39.73 <br />SY <br />$735,005.00 <br />17309 <br />$687,686.57 <br />10 <br />INTEGRANT CURB DESIGN B624 <br />6800 <br />LF <br />$7.22 <br />LF <br />$49,096.00 <br />6612 <br />$47,738.64 <br />11 <br />STAMPED COLORED CONCRETE PAVEMENT <br />1000 <br />SY <br />$86.48 <br />SY <br />$86,480.00 <br />1288 <br />$111,386.24 <br />12 <br />TYPE MV3 WEARING COURSE MIXTURE <br />2000 <br />TON <br />537.00 <br />TON <br />$74,000.00 <br />1487.52 <br />$55,038.24 <br />13 <br />TYPE MV3 NON- WEARING COURSE MIXTURE <br />6550 <br />TON <br />$35.24 <br />TON <br />$230,822.00 <br />5240 <br />$184,657.60 <br />14 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />3100 <br />GAL <br />$2.17 <br />GAL <br />$6,727.00 <br />1825 <br />$3,960.25 <br />15 <br />15" RC PIPE SEWER DESIGN 3006, CL5 <br />1017 <br />LF <br />I $15.62 <br />LF <br />$15,885.54 <br />1017 <br />1 $15,885.54 <br />16 <br />18" RC PIPE SEWER DESIGN 3006, CL3 <br />895 <br />LF <br />$17.54 <br />LF <br />$15 , 698.30 <br />895 <br />$15,698.30 <br />17 <br />21" RC PIPE SEWER DESIGN 3006, CL3 <br />885 <br />LF <br />$20.06 <br />LF <br />$17,753.10 <br />724 <br />$14,523.44 <br />18 <br />24" RC PIPE SEWER DESIGN 3006, CL3 <br />1076 <br />LF <br />$22.00 <br />LF <br />$23,672.00 <br />810 <br />$17,820.00 <br />19 <br />27" RC PIPE SEWER DESIGN 3006, CL3 <br />442 <br />LF <br />$28.29 <br />LF <br />$12,504.18 <br />494 <br />$13,975.26 <br />20 <br />30" RC PIPE SEWER DESIGN 3006, CL3 <br />132 <br />LF <br />$33.40 <br />LF <br />$4,408.80 <br />131 <br />$4,375.40 <br />21 <br />36" SPAN RC PIPE - ARCH CL IIA <br />16 <br />LF <br />$60.67 <br />LF <br />$970.72 <br />16 <br />$970.72 <br />22 <br />33" RC PIPE SEWER DESIGN 3006, CL3 <br />336 <br />LF <br />$39.66 <br />LF <br />$13,325.76 <br />336 <br />$13,325.76 <br />23 <br />36" RC PIPE SEWER DESIGN 3006, CL3 <br />37 <br />LF <br />$46.60 <br />LF <br />$1,724.20 <br />37 <br />$1,724.20 <br />24 <br />44" SPAN RC PIPE - ARCH CL IIA <br />51 <br />LF <br />$73.61 <br />LF <br />$3,754.11 <br />51 <br />$3,754.11 <br />25 <br />42" RC PIPE SEWER DESIGN 3006, CL3 <br />206 <br />1 LF <br />$63.91 <br />LF <br />$13,165.46 <br />90 <br />$5,751.90 <br />26 <br />Sl" SPAN RC PIPE - ARCH CL IIA <br />561 <br />LF <br />$88.69 <br />LF <br />$49,755.09 <br />560 <br />$49,666.40 <br />27 <br />58" SPAN RC PIPE- ARCH CL IIA <br />36 <br />LF <br />$99.18 <br />LF <br />$3,570.48 <br />36 <br />$3,570.48 <br />28 <br />60" RC PIPE SEWER DESIGN 3006, CL3 <br />92 <br />LF <br />$113.45 <br />LF <br />$10,437.40 <br />24 <br />$2,722.80 <br />*Revised Per C.O. No.'s 1, 3 and 4 <br />** Revised Per C.O. No. 5 <br />GlSharedDocs/MunicipaUARemsey/ <br />3171 /ra3171pePAY ESTIMATE NO. 12 <br />PE -1 <br />-75- <br />