Laserfiche WebLink
PAY ESTIMATE NO. 12 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />Rid Schedule "r" - SA_P_ 199 - 109 -01 - Q... + NW r.....:.... -a <br />ITEM <br />NO. <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />MOUNT <br />USED <br />DATE <br />E <br />EXTENSION <br />213 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />49 <br />LF <br />$144.55 <br />LF <br />$7,082.95 <br />43 <br />$6,215.65 <br />214 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 - 4020 <br />11 <br />LF <br />$202.58 <br />LF <br />$2,228.38 <br />11 <br />$2,228,38 <br />215 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />10 <br />LF <br />I $240.94 <br />LF <br />$2,409.40 <br />10 <br />$2,409.40 <br />216 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 - 4020 <br />8 <br />LF <br />$284.46 <br />LF <br />$2,275.68 <br />12.7 <br />$3,612.64 <br />217 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 - 4020 <br />12 <br />LF <br />$355.03 <br />LF <br />$4,260.36 <br />12 <br />$4,260.36 <br />218 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 78 - 4020 <br />19 <br />LF <br />$354.94 <br />LF <br />$6,743.86 <br />0 <br />$0.00 <br />219 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 - 4020 <br />7 <br />1 LF <br />$456.75 <br />LF <br />$3,197.25 <br />17.3 <br />$7,901.78 <br />220 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 - 4020 <br />40 <br />LF <br />$544.76 <br />LF <br />$21,790.40 <br />40 <br />$21,790.40 <br />221 <br />CASTING ASSEMBLIES SPECIAL <br />30 <br />EACH <br />$479.25 <br />EACH <br />$14,377.50 <br />30 <br />$14,377.50 <br />222 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 <br />6 <br />EACH <br />$376.58 <br />EACH <br />$2,259.48 <br />6 <br />$2,259.48 <br />223 <br />4" CONCRETE WALK <br />23000 <br />SF <br />$2.01 <br />SF <br />$46,230.00 <br />3960 <br />$7,959.60 <br />224 <br />6" CONCRETE WALK <br />2500 <br />SF <br />$4.33 <br />SF <br />$10,825.00 <br />$0.00 <br />225 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />2430 <br />LF <br />$7.59 <br />LF <br />$18 <br />2140 <br />$16,242.60 <br />226 <br />PEDESTRIAN CURB RAMP <br />24 <br />EACH <br />$319.92 <br />EACH <br />57,678.08 <br />8 <br />$2,559.36 <br />227 <br />SIGN PANELS TYPE C <br />188.5 <br />SF <br />1 $22.19 <br />SF <br />$4,182.82 <br />72.5 <br />$1,608.78 <br />228 <br />PAVEMENT MESSAGE ONLY EPDXY <br />4 <br />EACH <br />$200.00 <br />EACH <br />$800.00 <br />$0.00 <br />229 <br />PAVEMENT MESSAGE RIGHT ARROW) EPDXY <br />3 <br />EACH <br />$144.48 <br />EACH <br />$433.44 <br />3 <br />$433.44 <br />230 <br />PAVEMENT MESSAGE LEFT ARROW EPDXY <br />5 <br />EACH <br />$144.48 <br />EACH <br />$722.40 <br />5 <br />$722.40 <br />231 <br />F & I SIGN PANELS TYPE "D" <br />3 <br />EACH <br />$258.00 <br />EACH <br />$774.00 <br />3 <br />$774.00 <br />232 <br />4" SOLID LINE WHITE - PAINT <br />1850 <br />LF <br />$0.41 <br />LF <br />$758.50 <br />$0.00 <br />233 <br />24" SOLID LINE WHITE - PAINT <br />20 <br />LF <br />$3.87 <br />LF <br />$77.40 <br />26 <br />$100.62 <br />234 <br />36" SOLID LINE WHITE - PAINT <br />50 <br />LF <br />$5.68 <br />LF <br />$284.00 <br />$0.00 <br />235 <br />4" BROKEN LINE YELLOW - PAINT <br />150 <br />LF <br />$0.42 <br />LF <br />$63.00 <br />761 <br />$319.62 <br />236 <br />4" DOUBLE SOLID LINE YELLOW - PAINT <br />1150 <br />LF <br />$0.85 <br />LF <br />$977.50 <br />$0.00 <br />237 <br />24" SOLID LINE YELLOW - PAINT <br />180 <br />IF <br />$2.58 <br />LF <br />$464.40 <br />33 1 <br />$85.14 <br />238 <br />4" SOLID LINE WHITE - EPDXY <br />4100 <br />LF <br />$0.50 <br />LF <br />$2,050.00 <br />4100 <br />$2,050.00 <br />239 <br />24" STOP LINE WHITE - EPDXY <br />300 <br />LF <br />$7.22 <br />LF <br />$2,166.00 <br />135 <br />$974.70 <br />240 <br />36" SOLID LINE WHITE - EPDXY <br />570 <br />LF <br />$8.67 <br />LF <br />$4,941.90 <br />$0.00 <br />241 <br />4" BROKEN LINE YELLOW - EPDXY <br />1800 <br />LF <br />$0.51 <br />LF <br />$918.00 <br />260 <br />$132.60 <br />242 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />600 <br />IF <br />$1.01 <br />LF <br />$606.00 <br />600 <br />$606.00 <br />243 <br />24" SOLID LINE YELLOW - EPDXY <br />50 <br />LF <br />$5.68 <br />LF <br />$284.00 <br />50 <br />$284.00 <br />244 1 <br />INSTALL 4 " -6" PVC (SCH 40 ) CONDUIT <br />loon <br />IF <br />$6.45 <br />LF <br />$6,450.00 <br />1000 <br />$6,450.00 <br />G: /SharedDoas /MunicipaVARamsey/ <br />3171 /ra317lpePAY ESTIMATE NO. 12 <br />PE -8 <br />i <br />