My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 06/26/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:24:08 PM
Creation date
6/22/2007 11:51:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 12 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />Isla acneuule <br />ITEM <br />NO. <br />.. V - a.A.r. x -i- -v. - Allmtltl .-- ,...... <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO- <br />DATE <br />EXTENSION <br />245 <br />BALECHECK <br />50 <br />EACH <br />$11.87 <br />EACH <br />$593.50 <br />191 <br />$0.00 <br />246 <br />SILT FENCE TYPE MACHINE SLICED <br />300 <br />LF <br />$1.81 <br />LF <br />$543.00 <br />860 <br />$0.00 <br />247 <br />ITEMPORARY CONSTRUCTION ROCK ENTRANCE <br />1 <br />EACH <br />$2,412.51 <br />EACH <br />$2,412.51 <br />1 <br />$2,412.51 <br />248 <br />SEEDING <br />1.3 <br />ACRE <br />$258.00 <br />ACRE <br />$335.40 <br />1.3 <br />$335.40 <br />249 <br />SODDING, TYPE LAWN <br />3700 <br />SY <br />$2.48 <br />SY <br />$9,176.00 <br />0 <br />$0.00 <br />250 <br />SEED MIXTURE 260 <br />130 <br />LB <br />$2.63 <br />LB <br />$341.90 <br />180 <br />$473.40 <br />251 <br />MULCH MATERIAL TYPES <br />16 <br />TON <br />$154.80 <br />TON <br />5402.48 <br />2.6 <br />$402.48 <br />252 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />100 <br />SY <br />$2.32 <br />SY <br />$232.00 <br />1250 <br />$2,900.00 <br />253 <br />COMMERCIAL FERTILIZER ANALYSIS 24 -2 -24 <br />520 <br />LBS <br />$0.36 <br />LBS <br />$187.20 <br />520 <br />$187.20 <br />Total Bid Schedule "C" <br />$600,056.05 $488,476.86 <br />Isla acneanle <br />ITEM <br />NO. <br />°U° - nrunesione career n w"- ru-m <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO- <br />DATE <br />EXTENSION <br />254 <br />REMOVE BITUMINOUS PAVEMENT <br />100 <br />SY <br />$5.72 <br />SY <br />$572.00 <br />191 <br />$1,092.52 <br />255 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />400 <br />LF <br />$0.93 <br />LF <br />$372.00 <br />860 <br />$799.80 <br />256 fCOMMON <br />EXCAVATION, EV <br />200 <br />CY <br />$3.20 <br />CY <br />$640.00 <br />2200 <br />$7,040.00 <br />257 <br />SALVAGED TOPSOIL FROM STOCKPILE, SV <br />100 <br />CY <br />$6.60 <br />CY <br />$660.00 <br />600 <br />$3,960.00 <br />258 <br />AGGREGATE BASE CLASS 5 MODIFIED <br />100 <br />TON <br />$9.79 <br />TON <br />$979.00 <br />139 <br />$1,360.81 <br />259 <br />TYPE MV3 WEARING COURSE MIXTURE <br />50 <br />TON <br />$37.00 <br />TON <br />$1,850.00 <br />50 <br />$1,850.00 <br />260 <br />15" RC SAFETY APRON <br />2 <br />EACH <br />$487.34 <br />EACH <br />$974.68 <br />$0.00 <br />261 <br />4" DUCTILE IRON PIPE CLASS 53 <br />200 <br />LF <br />$11.35 <br />LF <br />$2,270.00 <br />189 <br />$2,145.15 <br />262 <br />6" DUCTILE IRON PIPE CLASS 53 <br />100 <br />LF <br />$11.73 <br />LF <br />$1,173.00 <br />95 <br />$1,114.35 <br />263 <br />8" DUCTILE IRON PIPE CLASS 52 <br />640 <br />LF <br />$14.73 <br />LF <br />$9,427.20 <br />552 <br />$8,130.96 <br />264 <br />12" DUCTILE IRON PIPE CLASS 52 <br />2700 <br />LF <br />$21.77 <br />LF <br />$58,779.00 <br />2411 <br />$52,487.47 <br />265 <br />8" SDR 26 PVC PIPE 10 -12' <br />120 <br />LF <br />$9.33 <br />LF <br />$1,119.60 <br />186 <br />$1,735.38 <br />266 <br />8" SDR 26 PVC PIPE 12 -14' <br />95 <br />LF <br />$9.68 <br />LF <br />$919.60 <br />95 <br />$919.60 <br />267 <br />8" SDR 26 PVC PIPE 14.16' <br />40 <br />LF <br />$10.52 <br />LF <br />$420.80 <br />40 <br />$420.80 <br />268 <br />12" SDR 26 PVC PIPE 10 -I2' <br />401 <br />LF <br />$14.10 <br />LF <br />$5,654.10 <br />401 <br />$5.654.10 <br />269 <br />12" SDR 26 PVC PIPE 12 -14' <br />S5 <br />LF <br />$14.46 <br />LF <br />$795.30 <br />$0.00 <br />270 <br />21" SDR 26 PVC PIPE 10 -IT <br />240 <br />LF <br />$55.36 <br />LF <br />$13,286.40 <br />217 <br />$12,013.12 <br />271 <br />21" SDR 26 PVC PIPE 12 -14' <br />760 <br />LF <br />$55.81 <br />LF <br />$42,415.60 <br />760 <br />$42,415.60 <br />G: /SharedDoes/Municipal/ARamsey/ PE -9 <br />3171 /ra3171pePAY ESTIMATE NO. 12 <br />_83_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.