Laserfiche WebLink
<br />CASE # 1 <br /> <br />REQUEST FOR AN INTERIM USE PERMIT TO ALLOW FOR <br />A TEMPORARY WELL HOUSE <br />CASE OF CITY OF RAMSEY PUBLIC WORKS DEPARTMENT <br />By: , Tim Gladhill, Management Intern <br /> <br />Background: <br /> <br />The Ramsey Public Works Department Utilities Division has submitted an application for an Interim <br />Use Permit (IUP) to place a temporary well house on the same parcel as Fire Station #1. A Well <br />House is needed for chemical feed for Wells 7 & 8. <br /> <br />The following items are enclosed for your review: <br /> <br />a) Site location map <br />b) Site Layout <br />c) Sample Elevations <br />d) Proposed Findings of Fact <br />e) Proposed Interim Use Permit <br /> <br />Notification: <br /> <br />State law requires notification to properties within 350 feet of the boundaries of the subject property <br />and property owners within that radius were notified. <br /> <br />Observations: <br /> <br />The City of Ramsey Public Works Utilities Division has applied for an IUP to install a temporary <br />well house. A larger water treatment plant is planned for the adjacent property, and all operations of <br />this proposed temporary well house can be incorporated into the new water treatment plant upon <br />construction of such facility. <br /> <br />This temporary well house is proposed to be constructed of wood frame construction as opposed to <br />block walls. The change in building materials reflects a significant cost savings due the temporary <br />nature of this structure. <br /> <br />The proposed location of the temporary well house meets and/or exceeds the minimum required <br />setbacks for the Public/Quasi Public District. <br /> <br />The timeframe for construction of the proposed future water treatment plant is not known at this <br />point. The maximum duration of an Interim Use Permit is five (5) years from the date of approval, <br />unless otherwise approved by the City Council. <br /> <br />Funding Source: <br /> <br />Funding for review will be paid from an escrow set up paid for by the applicant. Funding to construct <br />the antenna will be paid for by the applicant. <br /> <br />Recommendation: <br />