Laserfiche WebLink
<br />2006 water trunk fee in the amount of One Thousand Nine Hundred Twenty Five Dollars and <br />no cents ($1,925.00) per lot and the 2006 sanitary sewer trunk fee in the amount of One <br />Thousand One Hundred Thirty Seven Dollars and no cents ($1,137.00) per lot have been <br />paid. Therefore, there is no required payment for the sewer and water trunk fees for the Plat. <br /> <br />12. Stormwater Management Fee. The 2007 Stormwater Management Fee is Four Hundred <br />Sixteen Dollars and no cents ($416.00) per lot. Stormwater Management Fee obligations for <br />the Plat are Six Thousand Two Hundred Forty Dolla.r;s and no cents ($6,240.00) (15 lots x <br />$416.00/10t). <br /> <br /> <br />SECTI <br />STAGE II IMPROVEMENTS A <br /> <br />13. Stage II Improvements Required. The <br />the DEVELOPER to construct within the PIa <br /> <br />reqUIres <br /> <br />a) Street striping and signing <br />b) Traffic signing <br />c) Future Through Street Signing <br />d) Street lights <br />e) Street light maintenance <br />f) Street sweeping <br />g) Seal coating <br /> <br />ments. Th will install in the Plat the Stage II <br />shall also deposit an amount that is determined by the <br />ration and maintenance of street lights in locations <br />. neer and installed by Connexus for the first three <br />will bill residents in the Plat at least quarterly <br />and ope on costs; billing will be initiated at the time a <br />water and sanitary sewer. The DEVELOPER will pay to <br />0% of the City Engineer's estimated construction cost of the <br />nal Plat.. The City Engineer's estimated cost of construction <br /> <br />. ng (1 @$200) <br />200) <br />"~'Fe eet signing (1@$200) <br />Street lign , $1500) <br />Street light maintenance (3 @$270) <br />Street sweeping <br />Seal coating (2475 Sq. yds (ci)$.85/sq. yd.) <br /> <br />$ 200.00 <br />$ 400.00 <br />$ 200.00 <br />$4,500.00 <br />$ 810.00 <br />$ 300.00 <br />$2.100.00 <br /> <br />("Stage II Improvements") <br /> <br />Total <br />Brookfield Fourth Addition <br />Development Agreement <br />Page 5 of 11 <br /> <br />$ 8,510.00 <br /> <br />. -135- <br /> <br />