My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 08/28/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:31:36 PM
Creation date
8/24/2007 12:11:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />15. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building <br />permit applicant or the homeowner at the time the Certificate of Occupancy is issued or as <br />soon thereafter as possible, weather permitting. In the event this improvement is not timely <br />installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br />CITY may install said improvement on the lot and specially assess the cost therefore against <br />the lot. The DEVELOPER hereby waives all right . earing and other statutory <br />rights or City Charter rights granted a property 0 to special assessments, <br />including the right to appeal the special ass nt . on of the hard surfaced <br />driveway. In addition, the DEVELOPER to enter on each lot of <br />the Plat in order to install the improveme e has not <br />been previously constructed. <br /> <br />16. Street Cleaning. After the street surfacing is . <br />soil, earth, or debris from the streets within <br />the Plat by the DEVELOPER or its succes <br />may remove accumulations of soil, e <br />construction of the Plat. It shall b <br />associated with this necessary street <br />for such costs shall be paid within <br /> <br /> <br />ccupancy Permits. No building permit for any lot in the <br />driving surface is installed to within 300 feet of the <br />. g that survey information required by the CITY <br />lal; (c) all the financial guarantees. required by the <br />d) densl transition landscaping within Block 2 has been <br />ITY (building permits for Block 1. may be released prior to <br />eement has been signed and received by the CITY. All <br />e a certificate of elevation verifying that the actual elevation <br />ed grading and drainage plan. <br /> <br />No occu Y lot in the Plat shall be issued until: (a) vehicular access to the <br />lot is provi the installation of at least one layer of bituminous surfacing; (b) <br />both the sanitary and water utilities are in place, fully operational, and accepted by the <br />CITY; ( c) for lots . at have a slope of less than 2%, a certificate of grading, prepared by a <br />licensed (State of Minnesota), professional land surveyor, must be provided to the City <br />documenting that the flattest grade on this lot is. 1 % or greater will require certificates of <br />grading; and (d) boulevard sod and landscape trees, or escrow for same, have been provided <br />(see Paragraph 21 below). <br />. <br /> <br />Brookfield Fourth Addition <br />Development Agreement <br />Page 6 of 11 <br /> <br />-136- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.