Laserfiche WebLink
<br />Staff Recommendation: <br /> <br />Staff recommends that the youth association's request be approved for fencing ballfields #2 arid <br />#3 at Alpine Park - provided that it is understood by all parties that certain specifications and <br />project details are adhered to. These project minimums are addressed in the Commissions <br />suggested motion. <br /> <br />Commission Action: <br /> <br />Motion to recommend City Council award an not-to-exceed cost of $5,000 for outfield fencing <br />for fields #2 and #3 at Alpine Park, provided that; <br /> <br />· A minimum of $5,000 in cash contributions is allocated to the project by ARAA and the <br />City's cash contributions do not exceed $5,000. <br />· Any contractors or vendors working on City property are licensed or permitted to work in <br />the City; and they are insured with the City receiving a certificate of insurance before any <br />work is performed. <br />· The City shall be notified before any work will begin, with an on-site preconstruction <br />conference to occur with City staff present for each trade's work. <br />· The outfield fencing fabric shall be galvanized 9 gauge chainlink, with 2" line posts and <br />2 Y2" terminal posts with associated materials that meet or exceed the existing fencing <br />materials specifications. <br />· The concrete maintenance strip shall be continuous; a minimum of 18" wide, greater than <br />3.5" in depth and professional finished with neatly formed edges. The center should be <br />higher than the edges to allow grass clippings to rinse off the sides - with the outer edges <br />I" higher than soil line. <br />· ARAA warrants that the outfield fencing project is approved as complete, and that any <br />additions discovered to make the project 'whole' like plastic top guards or warning tracks <br />are accommodated by ARAA. <br />· All restoration of turf etc. shall be complete by March 31 st, 2008. <br /> <br />P&R: 09/13/07 <br /> <br />Reviewed by: <br />Parks Supervisor <br />Director of Public Works/Principal City Engineer <br />Finance Officer <br />City Administrator <br /> <br />P & R: 09/13/07 <br />