My WebLink
|
Help
|
About
|
Sign Out
Home
04/08/97
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1997
>
04/08/97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:08:17 AM
Creation date
6/25/2003 8:09:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
04/08/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
needed for the well to avoid interference with Well No. 3 and to assure that the additional <br />pumping will not alter groundwater flow from the landfill. It is expected that a recommendation <br />will be ready within two weeks. <br /> <br />The 1997 budget projects $325,000 for the installation of Well No. 4. The price for constructing <br />the well itself is $81,455 which is secured from Alberg. To produce water for the system will <br />require a pump, vault, and electrical controls estimated at $133,200. Additionally watermain to <br />the well house is estimated at $36,000. Since the size of the pump and well location are <br />unknown at this time, these must be viewed as budget numbers. The total project cost with 25% <br />for engineering legal and administrative is estimated to be $313,900. <br /> <br />Committee Action: Information only, no action is required. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Finance Officer <br /> <br />RB: 04/08/97 <br /> <br />/jmt <br /> <br />wtutilm, doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.