Laserfiche WebLink
needed for the well to avoid interference with Well No. 3 and to assure that the additional <br />pumping will not alter groundwater flow from the landfill. It is expected that a recommendation <br />will be ready within two weeks. <br /> <br />The 1997 budget projects $325,000 for the installation of Well No. 4. The price for constructing <br />the well itself is $81,455 which is secured from Alberg. To produce water for the system will <br />require a pump, vault, and electrical controls estimated at $133,200. Additionally watermain to <br />the well house is estimated at $36,000. Since the size of the pump and well location are <br />unknown at this time, these must be viewed as budget numbers. The total project cost with 25% <br />for engineering legal and administrative is estimated to be $313,900. <br /> <br />Committee Action: Information only, no action is required. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Finance Officer <br /> <br />RB: 04/08/97 <br /> <br />/jmt <br /> <br />wtutilm, doc <br /> <br /> <br />