Laserfiche WebLink
extension of C.R. #1 I6, and temporarily with a gravel drive down the City-owned right-of-way <br />for C.R. #116. <br /> <br />Committee Action: <br /> <br />At this point, I would be asking the City Council to consider the following actions to proceed <br />with this project: <br /> <br />1. Authorize Alberg Well to proceed with the construction of Well No. 4 at the contract price of <br /> $81,455. <br /> <br />Reviewed by: <br />City Engineer <br /> <br />RB:05/13/97 <br /> <br />~shared\councilcXrbwell4.doc <br /> <br /> <br />