Laserfiche WebLink
<br />Mn/DOT Agreement No. 91083 <br />Anoka County Project Number SP 199-010-09 <br />Exhibit A; Scope of Work and Deliverables <br /> <br />timing) <br />6.9 Presentation of Layouts to MnJDIT Metro Layout Approval Committee (intermediate layout) <br />6.10 Draft EA Review <br />6.11 Submittal of Preliminary Cost Estimates <br />6.12 Submittal of Revised Draft EA . <br />6.13 Public Information Meetings (intermediate layout/draft EA and finallayoutJEA - <br />consultant to identify any additional public information meetings) <br />Response to Agency and Public Comments in Draft and Final EAs <br />Final EA Review . <br />Final Layout, Profile and Cross-section Review <br />Hydrologic Model Submittal <br />. Submittal of Final Cost Estimates <br />Submittal of Revised Final EA <br />Submittal ofEA Update <br />Submittal of FONSI Request <br />Obtain Mn/DOT Staff Approval of Layouts <br />Obtain Municipal Approval of Layouts . <br />Study Report <br /> <br />6.14 <br />6.15 <br />6.16 <br />6.17 <br />6.18 <br />6.19 <br />6.20 <br />6.21 <br />6.22 <br />6.23 <br />6.24 <br /> <br />7. Project Reviews <br />A review of the draft and fmal EAs and EA Update will be provided according to the Mn/DOT HPDP <br />Manual. Mn/DOT, Anoka County and the City of Ramsey will make a review of the preliminary layouts and <br />profiles, intermediate layouts and profiles, and final layouts, profiles and cross-sections. A review period of at <br />least three weeks will be made available. Mn/DOT, AnokaCounty and the City of Ramsey will also provide <br />a review of the Final Study Report; at least three weeks will be made available for review. <br /> <br />8. Deliverables Provided To The Consultant <br />Mn/DOT, Anoka County and the City of Ramsey will provide the following information to the successful <br />consultant: <br /> <br />8.1 State Will Provide: <br />8.1.1 TH 10 IRC Study, <br />8.1.2 Northwest Metro Corridor and River Crossing Study & Scoping Decision Document <br />. TH 10 corridor base mapping with the City of Ramsey, <br />. Existing mainline right' of way limits and existing mainline alignments on TH 10 within <br />the City of Ramsey <br />. Background air quality report for the project arel! <br />. TH 10 corridor base mapping with the City of Ramsey, <br />. Existing traffic volumes on TH 10 <br />. L WD Cost Estimating Template <br /> <br />County Will Provide: <br />. TH 10 Access Management Study, <br />. TH 47 Study (in progress) <br />. TH 10 Fairoak to Thurston Study in Anoka (in progress) <br />'. Access to the Traffic Model for Anoka County <br /> <br />-393- <br /> <br />Page 6 of7 <br />