My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 07/17/2007
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000 - 2009
>
2007
>
Minutes - Public Works Committee - 07/17/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:50 PM
Creation date
9/25/2007 2:10:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
07/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Area 1 to be assessed 100% of sanitary sewer, lateral watermairi, trunk water and sewer <br />charges, storm sewer, the width of a 30 feet street restoration, and 50% of sidewalk. <br />. City would contribute cost of additional street width beyond 32 feet, water trunk costs, <br />and 100% of the sidewalk. <br /> <br />Chairperson Elvig inquired why Areal would be assessed and not Area 2. <br /> <br />Civil Engineer II Linton replied. Area 1 was the first option the Committee asked about that <br />confines it to the people that are most in favor of the improvements. In Area 2 most of the <br />property owners said there was no value. <br /> <br />Public Works Director Olson indicated the Asmussen's are only interested in the improvements <br />if the drainage easement on their north two properties are vacated. He is not sure the City would <br />want to do that, as it would be counter-productive to give away land that ponding is currently <br />located on. <br /> <br />Chairperson Elvig noted there was a question as to whether that pond is completely on City <br />property. <br /> <br />Public Works Director Olson replied the pond is located on a drainage and utility easement. <br /> <br />Chairperson Elvig noted if Area 1 were to be completed the hope is that Area 2 would eventually <br />hook up as well. He would propose continuing up to 150th at the City's cost if this option is <br />done. <br /> <br />Civil Engineer II Linton indicated Chairperson Elvig's suggestion is included as Option 3. Mr. <br />Linton provided an overview of the following options for improvements and funding strategies <br />for consideration: <br /> <br />Option 2 <br />Improvements - Sanitary sewer, water, storm sewer and street restoration to be provided in Area. <br />1, and street replacement is extended into Area 2. Sidewalk would connect from The Meadows <br />to CSAH 5. <br />Financing <br />· Area 1 to be assessed 100% of sanitary sewer, lateral watermain, trunk water and sewer <br />charges, storm sewer, and the width of a 32 feet street restoration. <br />· Area 2 would be assessed 50 % of the cost of street improvements, which includes storm <br />sewer. <br />· City would contribute cost of additional street width beyond 32 feet, water trunk costs, <br />and 100% ofthe sidewalk. <br /> <br />Option 3 <br />Improvements - Sanitary sewer, water, storm sewer and street restoration and sidewalk to be <br />provided in Area 1, and sanitary sewer and water and street replacement and sidewalk is <br />extended into Area 2. <br />Financing <br /> <br />Public Works Committee / July 17, 2007 <br />Page 8 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.