My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 10/09/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:38:53 PM
Creation date
10/5/2007 1:36:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of completion of the construction of the Required Improvements shall be made by the City <br />Council after consultation with the City Engineer. In the event the Permittee fails to construct <br />and install the Required Improvements as required herein, the City Council may order the <br />completion of the Required Improvements with City day labor and/or by letting contracts for <br />said completion and draw upon the escrow for payment. Only the City Council shall have the <br />authority to direct completion of the Required Improvements and withdraw from the escrow <br />account. The Permittee hereby grants permission and a license to the City and/or its contractors <br />and assigns to enter upon the Site for the purpose of completing the construction and <br />installation of the Required Improvements in the event of the Permittee's default. <br />12. MAINTENANCE GUARANTEE FOR LANDSCAPING. It is herein agreed that the <br />Permittee shall provide a maintenance guarantee to ensure the survival of the plantings. Said <br />maintenance guarantee shall consist of cash or a letter of credit, approved as to form by the <br />City, in the amount of Three thousand, two hundred, eleven dollars and no cents ($3,211.00) [# <br />plantings (32 trees, 82 shrubs) x cost/planting ($150 /tree, $75 /shrub) x 30% average non - <br />survival rate], which shall be in effect for a two -year period commencing on the date of the <br />City's acceptance of said plantings as part of the Required Improvements. <br />At the end of the two -year period, the maintenance guarantee shall be returned to the Permittee. <br />The determination that all plantings that have been planted in accordance with the Site Plan and <br />Landscaping Plan have either survived or have been replaced shall be made by the City Council <br />after consultation with the City Engineer. In the event the Permittee fails to maintain the <br />required plantings for a two -year period, the City Council may order the replacement of <br />plantings with City day labor and/or by letting contracts and draw upon the escrow for <br />payment. Only the City Council shall have the authority to direct replacement of the plantings <br />and withdraw from the escrow account. The Permittee hereby grants permission and a license <br />to the City and/or its contractors and assigns to enter upon the Site for the purpose of replacing <br />plantings in the event of the Permittee's default. <br />13. INSPECTION FEES. The Permittee shall be responsible for all inspection costs incurred by <br />the City related to the installation of the Required Improvements. The Permittee shall make a <br />cash deposit into the appropriate escrow account at the City and the City shall have the <br />authority to draw upon these funds for the purpose of compensating for inspection services. <br />The amount of the deposit shall be equal to five percent (5 %) of the estimated cost of the <br />Required Improvements, which equates to Six thousand dollars and no cents ($6,000,00). This <br />is to cover the cost of inspecting the site grading and installation of improvements. Upon <br />completion of the Improvements to the satisfaction of the City, any surplus balance remaining <br />in the City's escrow account shall be refunded to the Permittee. <br />14. STORMWATER MANAGEMENT . FEES. The current Stormwater Management Fee is <br />$4,151.00 per commercial acre. Stormwater management fee obligations for the Development <br />are Six thousand, two hundred, twenty -seven dollars and no cents ($6,227.00). <br />15. OUTSIDE REGULATORY AGENCIES. The Permittee herein agrees to be <br />responsible for obtaining all required permits or licenses from any other regulatory agencies. <br />— <br />Development Permit <br />Sunfish Lake Development <br />October 2007 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.