Laserfiche WebLink
The County will arrange a meeting between the BNSF Railroad, the Minnesota Department of <br />Transportation, the City and the County to discuss the improvement of the railroad crossing at Sunf sh <br />Lake Boulevard and the BNSF Railroad tracks. ' <br />. . ~ The parties anticipate the cost of the permanent signal will be split as follows:. <br />. ~ ~ A. The State will pay 95 percent of the permanent signal system costs (qualifies for HES). <br />B. The City will pay 5 percent of the permanent signal system costs. <br />The City and County will be responsible for funding the roadway construction on Sunfi <br />Boulevard. sh Lake <br />The design of Sunfish Lake Boulevard south of TH 10 in a northbound direction will have a concre <br />:median barrier; a 14. foot left turn lane for northbound-to=westbound. traffic, a 12 foot through Iane and <br />a 14 foot right turn lane: <br />The design-for Sunfish Lake Boulevard south of TH 10' in a southbound direction will have one14 foot <br />southbound through lane plus a 10 foot wide, shoulder. <br />,R ~i~s ~ ~'ak~e EQule~ ard~northbgund`'7t~rt}i of Tu~'~n ,~r~~~:,: -l~.g_. <br />