My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Parks and Recreation Commission - 04/24/1978
Ramsey
>
Public
>
Minutes
>
Parks and Recreation Commission
>
1978
>
Minutes - Parks and Recreation Commission - 04/24/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:55:13 PM
Creation date
4/15/2004 12:18:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Parks and Recreation Commission
Document Date
04/24/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY <br /> <br />Parks and Recreation Commission <br /> April 24, 1978 <br /> <br />A special meeting of the Ramsey Parks and Recreation Commission was <br />called to order at 6 P.M. Monday April 24, 1978 to finalize a recommend- <br />ation for the ball field complex at the Elementary school property. <br /> <br />In attendance: <br /> <br />Darrell Jensen <br />Doris Irvine <br />John Zobava <br />John Lichter <br />Kevin Walter <br />Bob Walz <br />ClaYton Berg <br /> <br />Reference Clayton Berg memo of March 24, 1978 - Alternate #1 <br /> <br />1) Initial grading <br />2) 2,000 cu. yards clay plus placement 4" <br />3) 1,000 cu. yards black dirt plus placement 2" <br />4) 270 tons ag. lime plus placement <br />5) 6 portable bleachers $680 each <br />6) 2 bike racks $153 each <br />7) 6 players benches $63 each <br />8) 3 back stops $1,099 each <br />9) Fencing 4' high - 3 ball fields $2,224 each <br /> <br />$ 500.00 <br />7,000.00 <br />4,500.00 <br />1,890,00 <br />4,080.00 <br />306.00 <br />378.00 <br />3,297.00 <br />6,672.00 <br /> <br />Total $28,623.00 <br /> <br />(Items 5 through 9 delivered only - installation <br />extra) <br /> <br />General opinion of the commission is that we approach this improvement <br />with the attitude of a fully complete, well done project. The recommend- <br />ation is in two stages - an immediate and fall so field can be used this <br />summer and should be complete by next fall. The recommendation is as <br />follows: <br /> <br />1) Renegotiate the lease with the school district for a 25 year period. <br /> <br />2) Obtain necessary engineering preparatory to survey and staking - <br /> cost unknown <br /> <br />3) Do the initial grading of site as soon as possible - $500 <br /> <br />4) Obtain and install the agra lime for infields as soon as possible - <br /> $1,890. <br /> <br />5) Obtain and install modified fencing about 540' as soon as possible - <br /> $1,350. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.