Laserfiche WebLink
The firm's ability to expedite the tasks tentatively entitled Development <br />Concepts, Individual Trail Corridor Descriptions, and especially, Individual Trail <br />Corridor Cost Estimates and Funding Proposals. <br /> <br />In addition to the above, the Commission may want to evaluate other aspects of the <br />proposals, including how well the firms responded to the RFP and the dollar to <br />anticipated value ratio. As stated, a common way to evaluate proposal is to assign points <br />to criterion. For instance, each bullet above could be worth 20 points, resulting in a i00 <br />point score. A presentation by the proposers may also be desired. <br /> <br />Attached for your information is the RFP the consultant's responded to. <br /> <br />Commission Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br />Parks/Utilities Supervisor <br /> <br />Copies to: <br />City Administrator <br />Public Works Director <br />Community Development Director <br /> <br />P&R: 11/15/01 <br /> <br />-10- <br /> <br /> <br />