Laserfiche WebLink
CHANGE ORDER FOR IMPROVEMENT PROJECT g95-18 <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />There was a minor change to Project Ig)5-18, the extension of water and sewer to River Plaza/47 <br />Addition. The original plan called for extending a sanitary sewer to the south side of the entrance <br />to the River's Bend shopping center. This would cause some degree of traffic disruption during <br />the excavation and continued inconvenience during the period between the excavation and final <br />bituminous patching. To avoid this, the manhole was moved to the north side of the drive. The <br />change order is for the cost of the precast manhole base. This cost change will offset by a reduced <br />length of sewer pipe and from the elimination of restoration of the service drive. <br /> <br />Staff Recommendation: <br /> <br />Approve Change Order for Improvement Project 4/95-18 in the amount of $648.14. <br /> <br />Committee Action: <br /> <br />Motion to recommend Council approval of Change Order #1 for Improvement Project g95-18 in <br />the amount of $648.14. <br /> <br />Reviewed by: <br /> <br />City Engineer <br /> <br />R&B: 12/12/95 <br /> <br /> <br />