My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/06/2008
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2008
>
Agenda - Planning Commission - 03/06/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:44:52 AM
Creation date
2/29/2008 12:47:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/06/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Class C Components - Building Expansion <br />Site P [an Review <br />February 28, 2008 <br />Page 3 013 <br />. A reject type curb should be considered rather than the standard gutter shown on <br />the detail. <br />. . A catch basin should be utilized to transmit runqff into the pond on the north east <br />corner of the property rather than realigning the rip rapped swale. This should also <br />reduce the size of the retaining wall required. <br />. The fall between the invert of the flared end section and the bottom of the pond <br />should be no greater than 18 inches. Therefore the invert should be lowered to <br />861.5. <br /> <br />A permit will need to be obtained from the Lower Rum River Water Management <br />Organization. <br /> <br />Easements: Drainage and utility ~asement should be dedicated over the ponding areas. <br /> <br />Utilities: This property is currently serviced by City sanitary facilities. No additional <br />utility connections are proposed to the new addition which will be serviced by the <br />existing services. Additional SAC and WAC charges will be collected upon issuance of <br />the building permit. <br /> <br />REU Number: The Residential Equivalent Unit (RED) is a method by assessing accurate <br />quarterly usage charges for stormwater management. The REU is based on percent of <br />impervious surface coverage The REU number will be adjusted to reflect the increased <br />impervious area as a result of tins expansion. <br /> <br />The Planning Commission meeting will be at 7:00 pm o~ Thursday, March 6, 2008 at the <br />Ramsey Municipal Center located at 7550 Sunwood Drive to' review your site plan. You, <br />or your representative, should be present at the meeting to answer any questions that may <br />arise. <br /> <br />If you have any questions, please call our office at 763-427-1410. <br /> <br />Sincerely, <br /> <br />CITY OF RAMSEY <br /> <br />'" . <br /> <br /> <br />~.!!u-4. <br /> <br />Amy GeiC AICP <br />Interim Asst. Com. Dev. Director <br /> <br />~J2~~' <br />Steve Jankowski, PE~ <br />City Engineer cJ <br /> <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.