Laserfiche WebLink
-122 <br />( "Required Improvements) ". <br />h. Irrigation metering and backflow devices shall be approved as part of the Utility Plan, and <br />installed accordingly. <br />i. Irrigation rain sensors shall be installed and appropriately placed throughout the <br />development. <br />5. FIRE LANES. Fire lanes shall be maintained on the Site. The exaeflocation of these items on <br />the Site shall be as directed by the City's Fire Chief <br />6. LIGHTING. Lighting shall be installed on the site in accordance with City Code, and in <br />accordance with the approved Lighting Plan, prepared by Onsite Lighting: and Survey dated <br />February 6, 2008. <br />7. BUILDING FACADE. The Permittee agrees to construct all building faces of the same <br />material and general design as indicated on the Building Elevations prepared by Architectural <br />Consortium, LLC dated February 5, 2008. <br />8. REQUIREMENTS FOR BUILDING PERMIT. No building permit for the Site will be <br />issued until the Permittee has: a) si and r this Development Permit; b) the City has <br />received the required financial surety:and inspection fees, c) complied with the City Staff <br />Review Letter dated February 29, 2008,' March 1 9, 2008: <br />No Certificate of Occupancy- for the structure will be issued until the Required Improvements, <br />or a financial surety for same are accepted by the City. <br />9. IMPROVEMENT CONSTRUCTION SCHEDULE. The Required Improvements shall be <br />completed before June 1, 2 <br />10. RECOGNITION OF LOCATION. The. Permittee herein agrees to recognize Ramsey as the <br />C of location onall forms of advertising and business correspondence whenever reasonably <br />11. FINANCIAL SURETY In order to ensure the installation of the Required Improvements in <br />accordance with City specifications and in a timely manner, the Permittee shall be required to <br />deposit with the City a cash escrow or letter of credit, approved as to form by the City, in the <br />amount of and no cents ($XXXXXXX) which is 125% of the <br />City's estimated cost of the Improvements. Prior to the issuance of the building permit, all <br />financial guarantees must be provided as required herein. (Add 9,500.00 to engineer # for <br />landscaping.) <br />Upon completion of the construction of the Required Improvements, the financial guarantee <br />shall be returned to the Permittee and the Permittee shall be required to provide the landscaping <br />maintenance guarantee described in Item #12 of this Development Permit. The determination <br />Development Permit <br />Goodyear Service Center <br />March 2008 <br />Page2of4 <br />