My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 01/13/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:46:56 PM
Creation date
1/8/2009 11:51:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Areas reserved for open space or dedicated, parkland, except for natural <br />areas that are left undisturbed, shall include a minimum of four (4) inches <br />of topsoil, as defined in Section 9.02, over the entire area and reestablish <br />the same with sod (or seed and/or native grasses and wildflowers, if <br />approved by City Council). Noxious weeds do not constitute acceptable <br />ground cover in any district. <br />c. Individual lots within a development must comply with the general <br />provisions for lawn requirements /ground cover as outlined in Subdivision <br />9 below. <br />d. Final slope grades shall not exceed 3.5:1, unless approval from City <br />Engineer is granted for terracing of retaining walls. Berming for parking <br />lots and open space areas shall not exceed a slope of 3:1. <br />Subd. 9. Lawn Requirements /Ground Cover. All exposed ground areas, <br />including boulevards and areas not devoted to off - street parking, driveways, sidewalks and/or <br />trails, patios or other such improvements shall be landscaped with grass, shrubs, trees and/or <br />other ornamental landscape materials within six (6) months of the date of issuance of the <br />Certificate of Occupancy. Also refer to individual zoning districts for specific planting <br />requirements. <br />a. Topsoil. In all zoning districts, a minimum of four (4) inches of topsoil, as <br />defined in Section 9.02, shall be applied across all exposed ground areas to <br />the edge of improved. streets, sidewalks, driveways and other impervious <br />surfaces, excluding natural areas that are left undisturbed, whenever a <br />building permit is issued for the construction of a principal building. <br />1. The depth of topsoil at the time of inspection shall be no less than four <br />(4) inches. <br />2. Alternatives to the import of topsoil, which meet the required <br />specification, shall be permitted only with the prior approval of the <br />City Engineer. <br />b. Required Ground Cover. In all zoning districts except R -1, all portions of <br />a site not covered by structures, concrete or asphalt, but excluding natural <br />areas that are left undisturbed, shall be finished with sod and/or plantings, <br />up to the edge of the improved street(s). Any alternative to the sod <br />requirement shall require City Council approval. <br />1. In the R -1 zoning district, sod is required in all boulevards, excluding <br />those areas devoted to sidewalks, trails and driveways. <br />
The URL can be used to link to this page
Your browser does not support the video tag.