My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 10/17/2006
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
2006
>
Minutes - Council Work Session - 10/17/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 4:14:56 PM
Creation date
2/9/2009 1:59:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Date
10/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Concept Estimate — Option 2: Stabilization of Existing Structure Anticipating New Fire <br />Station Construction in 2012 <br />• Concept Estimate — Option 3: New Construction <br />■ Concept Estimate — Comparison <br />Councilmember Jeffrey stressed the need to create a master facility plan for all of the City's <br />facilities. Under this type of plan facilities will be kept up to date and repaired to avoid the type <br />of costs they are facing with this building stabilization. <br />Mayor Gamec expressed his preference in a new building being completed for occupancy in <br />2009. <br />Councilmember Cook expressed concern in putting $130,000 into a building and tearing it down <br />in 2009. <br />Councilmember Strommen stated she would have a preference for Option 1 but the financial <br />situation needs to be reviewed including information on how the construction would be financed <br />in 2008 versus 2012 in Option 2. <br />Councilmember Jeffrey stated he agrees something needs to be done with the building, but the <br />financing package needs to be presented. <br />Fire Chief Kapler indicated the existing building will be vacated in 10 days; there needs to be a <br />determination of what level of stabilization work will be completed. <br />Council reviewed the recommended stabilization work assuming a near -term reconstruction and <br />a mid-term reconstruction. <br />Mayor Gamec questioned if Option 1 will take care of the heat situation in the building. <br />Assistant City Administrator Nelson noted the bulleted point included in Fire Chief Kapler's <br />memo of minor revisions to HVAC systems to increase efficiency and reduce costs of the less <br />occupied spaces. She indicated the cost for this work is approximately $4,000. <br />Councilmember Cook stated Option 1 needs to be committed to in order to complete the needed <br />stabilization work. The financing can then be reviewed to determine whether to remain with <br />Option 1 or move on to Option 2. <br />Councilmember Jeffrey stated he firmly believes the temperature can be turned down in the <br />offices. The revenue forecast for this project should not take long to put together and needs to be <br />reviewed. <br />Fire Chief Kapler indicated the Police Chief requested that he bring up the topic that this <br />building will still act as an emergency evacuation for the school. The evacuation process will be <br />a little different without staff being located in the building and coming from a distance away to <br />prep the building. <br />City Council Work Session / October 17, 2006 <br />Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.