Laserfiche WebLink
• Concept Estimate — Option 2: Stabilization of Existing Structure Anticipating New Fire <br />Station Construction in 2012 <br />• Concept Estimate — Option 3: New Construction <br />■ Concept Estimate — Comparison <br />Councilmember Jeffrey stressed the need to create a master facility plan for all of the City's <br />facilities. Under this type of plan facilities will be kept up to date and repaired to avoid the type <br />of costs they are facing with this building stabilization. <br />Mayor Gamec expressed his preference in a new building being completed for occupancy in <br />2009. <br />Councilmember Cook expressed concern in putting $130,000 into a building and tearing it down <br />in 2009. <br />Councilmember Strommen stated she would have a preference for Option 1 but the financial <br />situation needs to be reviewed including information on how the construction would be financed <br />in 2008 versus 2012 in Option 2. <br />Councilmember Jeffrey stated he agrees something needs to be done with the building, but the <br />financing package needs to be presented. <br />Fire Chief Kapler indicated the existing building will be vacated in 10 days; there needs to be a <br />determination of what level of stabilization work will be completed. <br />Council reviewed the recommended stabilization work assuming a near -term reconstruction and <br />a mid-term reconstruction. <br />Mayor Gamec questioned if Option 1 will take care of the heat situation in the building. <br />Assistant City Administrator Nelson noted the bulleted point included in Fire Chief Kapler's <br />memo of minor revisions to HVAC systems to increase efficiency and reduce costs of the less <br />occupied spaces. She indicated the cost for this work is approximately $4,000. <br />Councilmember Cook stated Option 1 needs to be committed to in order to complete the needed <br />stabilization work. The financing can then be reviewed to determine whether to remain with <br />Option 1 or move on to Option 2. <br />Councilmember Jeffrey stated he firmly believes the temperature can be turned down in the <br />offices. The revenue forecast for this project should not take long to put together and needs to be <br />reviewed. <br />Fire Chief Kapler indicated the Police Chief requested that he bring up the topic that this <br />building will still act as an emergency evacuation for the school. The evacuation process will be <br />a little different without staff being located in the building and coming from a distance away to <br />prep the building. <br />City Council Work Session / October 17, 2006 <br />Page 6 of 8 <br />