My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/17/2009
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2009
>
Agenda - Public Works Committee - 02/17/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:32:28 AM
Creation date
2/12/2009 11:59:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember McGlone suggested surveying the City and seeing where it is a problem and just <br />paving over a little further in those areas. <br />Public Works Supervisor Reimer stated that if you moved the paving over, you would just create <br />a "Talladega" in that situation because people would just keep moving over. <br />Councilmember McGlone asked about the rubber whip things that are found in tunnels and if <br />they could be used in these situations. <br />Public Works Supervisor Reimer stated that he thinks there would be a lot of phone calls because <br />people may not want them in their yards. • <br />Public Works Director Olson stated that Nowthen Estates was not included in the estimates in <br />the packet and noted there are some other projects that may also be coming up, such as <br />Chameleon Street or Ute Street. He noted that there is a bit of uncertainty with the budget <br />because the projects may or may not move forward based on possible counter petitions. <br />Councilmember McGlone stated that he also noticed that Andrie Street is not included. <br />Public Works Director Olson stated that this is because Andrie Street will almost entirely be <br />completed with State Aid funds. <br />City Engineer Jankowski reviewed the updated budget information that he distributed. He noted <br />that the City, in the past, assessed 50% for overlays and noted that the City is in the second year <br />of phasing out the assessment for seal coating so it will be a 36% assessment this year. He stated <br />that there was a surplus from 2008 of $95,779 because the overlay was not done on Andrie Street <br />and 164 Lane. <br />City Engineer Jankowski stated that he would like to complete a feasibility study for these <br />improvements. <br />Councilmember McGlone stated that bids for projects have been coming in lower than expected, <br />so there may be more money available than the City thinks. <br />Public Works Director Olson stated that it is always a "crap shoot" and they never really know <br />what the projects will be bid at, especially with the changing oil prices. <br />Chair Elvig confirmed that the feasibility studies are completed internally. <br />City Engineer Jankowski stated that he needs feedback from the Committee on possible <br />assessments for projects, such as Dysprosium Street, which is basically a reconstruction. <br />Public Works Director Olson stated that the difference is that the street is 44 feet wide now and <br />the. City put off reconstruction because the City wanted to see what would happen with the <br />realignment of TH 47. <br />Public Works Committee / January 20, 2009 <br />Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.