My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 09/29/2009
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2009
>
Agenda - Council Work Session - 09/29/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:21:39 PM
Creation date
9/25/2009 10:37:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
09/29/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCOPE OF WORK <br /> <br /> <br /> <br />The HKGijMSA team will meet with City Staff and the Steering Committee to review <br />comments on the design development documents and confirm direction of construction <br />documents, construction budgets and schedule. <br /> <br />The HKGijMSA team will prepare design development drawings for all site improvements <br />and sustainable design strategies approved in the design development set, including <br />circulation systems, landscaped areas, event spaces, stormwater areas, structures, lighting, <br />site furnishings, waterfeatures and other site amenities. It is anticipated the following will <br />be included in the construction document set: . <br /> <br />· Tree Protection Plan (if necessary) <br />· Site Demolition Plan <br />· Materials Plan(s) <br />· Layout Plan(s) <br />· Grading and Drainage Plan(s) (to be completed by others) <br />· Planting Plan(s) <br />· Irrigation Plan(s) <br />· Reference Sections <br />· Preliminary Construction Details <br />· Technical Specifications <br /> <br />50% Document <br /> <br />Upon completion of the 50% construction documents, we will conduct a 50 % review of <br />the documents with City Staff. We will review the set for code compliance and clarity of <br />the documents. The HKGijMSA team will coordinate reviews with all reviewing agencies. <br />The comments received will be incorporated into further refinement of the construction <br />documents. <br /> <br />90% Document Review <br /> <br />Upon completion of the 90% construction documents, we will conduct a 90% review of the <br />documents with City Staff. The HKGi/MSA team will coordinate reviews with all reviewing <br />agencies. The comments received will be incorporated into a final bid package. <br /> <br />Cost <br /> <br />The HKGi/MSA team will calculate a summary of quantities and prepare a final construction <br />cost estimate. <br /> <br />We will meet with and coordinate with City Staff during the course of construction <br />documentation to review progress of the documents. <br /> <br />IIKGi <br />Page 36 - Park Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.