Laserfiche WebLink
<br /> <br />3.2 Site Visits/Observation/MeetinQs: <br />" Perform site visits up to one (1) visit per week during construction activities to review work for <br />compliance with contract documents <br />" Prepare written field reports documenting site visits and observations <br />" Attend weekly construction meetings <br /> <br />Task 4: Contract Closeout <br />4.1 Record Drawinos: <br />Ii Prepare as-built record drawings in hard copy and electronic format in the current industry <br />standard software <br /> <br />Task 5: Survey Services <br />5.1 Field Survey: <br />" Conduct a detailed field topographic survey of the existing conditions of the site, between the <br />one-way roadways of East Ramsey Parkway, based upon Town Center project horizontal control <br />and benchmarks <br /> <br />5.2 Base Survey Plan: <br />" Prepare an electronic base survey plan for use in preparing final design and construction plans <br /> <br />12 <br /> <br />....-J-n Kimley-Hom <br />II....l_U and Associales, Inc. <br />