My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/13/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 10/13/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:22:09 PM
Creation date
10/8/2009 12:00:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALKER <br />PARKING CONSULTANTS <br />PROJECT SCHEDULE <br />We are fully prepared to meet the project schedule and anticipate documents will be ready for <br />bidding by February 2010. <br />SCOPE OF SERVICES <br />Project Start <br />Schematic Design Stair /Elevator <br />MnDOT Submittals <br />Design Development <br />Construction Documents <br />MnDOT Submittal <br />MnDOT Approvals <br />MNDOT /CMAQ SUBMITTALS <br />September 2009 <br />November 2009 <br />November 2009 <br />• December 2009 <br />January 2010 <br />January 2010 <br />March 2010 <br />Mr. Brian Meyer, P.E. <br />City of Ramsey <br />September 16, 2009 <br />Page 2 of6 <br />1. Complete Delegating Contracting Process, Project Memorandum and revisions to Categorical <br />Exclusions required for MnDOT review and approval. <br />2. Confirm original Phase 0 planning document footprint is still accurate and there are no <br />additional Right of Way requirements. <br />3. Resubmit ROW Certificate #1. <br />SCHEMATIC DESIGN <br />1. Confirm with City of Ramsey the number of parking spaces to be provided. <br />2.. Design the internal circulation for both vehicular and pedestrian flow for new elements <br />including new west stair /elevator tower. <br />3. Layout preliminary striping for the parking facility. <br />4. Locate and size new stair towers according to code and operational coordinating with new <br />development requirements. <br />5. `Select architectural concepts and materials. . <br />6. Prepare preliminary plans and outline specifications for the recommended scheme illustrating: <br />a. Internal parking structure, vehicular and pedestrian traffic flow. <br />b. Preliminary parking layouts including bay sizes, parking stall size and turning radii. <br />c. Locations of parking structure entry and exit lanes. <br />d. Recommend parking structure security provisions. <br />e. Preliminary architectural elevations illustrating materials and concepts. <br />7. Prepare a preliminary estimate of the probable construction cost for the parking facility. <br />8. Present the project schematic design to City of Ramsey. <br />M: \_PROPOSAL \Proposal 2009 \City of Ramsey \Prop 09 11)09 Olson.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.