Laserfiche WebLink
(i) Trail Development <br /> <br />(j) Sidewalks <br /> <br />(k) Electricity (within 1/4 mile) <br /> <br />(1) Phone (within ¼ mile) <br /> <br />(m) Natural gas within ¼ mile) <br /> <br />(n) Boulevard Sodding <br /> <br />(o) Water Shut Off Boxes <br /> <br />(p) Easement Acquisition <br /> <br />(q) As-Built Plans <br /> <br />(r) Stage I Financial Surety <br /> <br />Stage II Improvements. <br /> <br />(a) Street Striping and Si~maing <br /> <br />(b) Seal Coating <br /> <br />(c) Streel Lights <br /> <br />(d) Inspection <br /> <br />(e) Monuments <br /> <br />(f) Stage II Cash Deposit <br /> <br />9.50.50 <br /> <br />9.50.50 <br /> <br />Subd. 3. <br /> <br />Stage I Improvements <br /> <br />Trunk and Lateral Sanitary Sewer. Sanitary sewer mains and service <br />connections stubbed in to the property line shall be installed to serve all lots <br />in the Subdivision and other such properties served by the subdivision <br />sewer main, when the location of such plat is within an area of the City <br />which is either being assessed for sanitary sewer service or for which such <br />service has been authorized by the Council. <br /> <br />Trunk and Lateral Water Mains. Water mains and service connections <br />stubbed in to the property line shall be ,installed to serve all lots in the <br />Subdivision and other such properties served by the subdivision watermain <br /> <br />9.50 Subdivision Regulations <br /> <br />9-37 <br /> <br />August 2003 Draft <br /> <br />-325- <br /> <br /> <br />