Laserfiche WebLink
<br /> <br />arci1iteclt.lre , planlling' lr:rteriord$sign <br /> <br />. 4. TOTAL FEE <br /> <br />DESIGN FEE BREAKOUT by Scope of Services <br />A. Project Management Services <br />1. Schematic Phase <br />2. Design Phase <br />3. Construction Document Phase <br />4. Permitting <br />5. Bidding <br />6. Construction Administration Phase <br />7. Project Close-out <br />. Subtotal <br /> <br />B. Estimating Services <br />1. Schematic Phase <br />2. Design Phase <br />3. Construction Document Phase <br />4. Permitting <br />5. Bidding <br />6. Construction Administration Phase <br />7. Project Close-out <br />. Subtotal <br /> <br />C. Architectural Services <br />1. Schematic Phase <br />2. Design Phase <br />3. Construction Document Phase <br />4. Permitting <br />5. Bidding <br />6. Construction Administration Phase <br />7. Project Close-out <br />. Subtotal <br /> <br />D. AudioNisual Consultant Design Services <br /> <br />E. Deliverables/Reimbursable Expenses <br /> <br />F. Project Total Fees (lump sum) <br /> <br />$1,320.00 <br />$1,480.00 <br />$710.00 <br />$240.00 <br />$1,920.00 <br />$2,090.00 <br />$390.00 <br />$8,150.00 <br /> <br />$640.00 <br />$220.00 <br /> <br />$860.00 <br /> <br />$800.00 <br />$240.00 <br />$4,150.00 <br />$240.00 <br />$400.00 <br />$760.00 <br />$240.00 <br />$6,830.00 <br /> <br />$1,500.00 <br /> <br />$1,550.00 <br /> <br />$18.890.00 <br /> <br />-- <br />