Laserfiche WebLink
Ms. Amber Miller <br />City of Ramsey <br />September 16, 2009 <br />Page 4 <br />• Indicate that the City is in Transit market Area IV. <br />• Identify on a map the existing transit service, which is Route 856 Ramsey Star Express and the <br />park and ride at the municipal parking ramp. <br />Advisory Information: <br />• The Update states that the upgrade of TH 10 to a freeway is not in MnDOT's TIP through 2010. <br />It needs to note that the conversion of TH 10 to a freeway is not included in the Metropolitan <br />Council's 2030 Transportation Policy Plan (TPP) adopted in 2004 nor is it identified as an <br />expansion project in the 2030 TPP adopted in January, 2009. <br />• There appears to be missing text related to the bridge crossing: "A preferred location and design <br />of a grade - separated interchange between TH 1.0/169 and any potential Mississippi River bridge <br />crossing" (Page 6 -8, Paragraph 2). <br />• The TAZ population and household numbers are acceptable. The 2030 employment numbers are <br />not acceptable because they exceed the "pending" number by 1,953. <br />• The planned functional classification system contains a number of "collector" roads that are not <br />included on the TAB map. To include these planned facilities on the TAB map, the City needs to <br />formally request their inclusion through the TAC Planning committee, which is a process separate <br />from the Update review process. <br />• There is a conflict between the text that designates a new arterial, but maps this new arterial as <br />a future minor collector (Page 6 -7). <br />• Note in the text that the CMAQ grant, which funds most of the operating cost on the Ramsey Star <br />Express bus, expires in early 2010. <br />• The list of Northstar stations needs to include the Coon Rapids Riverdale stop. <br />• There are no Metropolitan Council plans to create a designated transitway on TH 10 similar to the <br />one on I -394. The Northstar Commuter Rail is a dedicated transitway serving this same corridor. <br />• Under the list of traffic demand management measures `MCTO' needs to be replaced with <br />`Metro Transit' (Page 6 -16). <br />Parks (Jan Youngquist, 651- 602 -1029) <br />The Update is incomplete for Parks review. <br />• Include a description of the Mississippi River, Rum River and Central Anoka County Regional <br />Trails (see System Statement). <br />• Identify all the master plan regional park boundaries facilities, and trail alignments on the Park, <br />Trail and Recreation Plan Map (Figure 10 -1) and the Appendix: Parks and Trails Plan — Parkland <br />Comparison Map (Figure 3 -28). <br />