My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes from 1992
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
LRRWMO
>
Minutes
>
Minutes from 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:31:09 PM
Creation date
4/14/2010 10:08:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Lower Rum River Water Management Organization
Document Date
12/17/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LRRWMO Meeting Minutes <br />April 15, 1992 <br />Page 2 <br />be taken from the savings account and placed in the <br />certificate of deposit account to earn somewhat better <br />interest. <br />Motion was made by Erickson, seconded by Weaver, to TAKE <br />$2,000.00 OUT OF THE EXISTING SAVINGS ACCOUNT BALANCE AND ADD <br />IT TO THE CERTIFICATE OF DEPOSIT ACCOUNT, AS RECOMMENDED BY <br />THE DEPUTY TREASURER. <br />Erickson stated he and Knutson will make the determination as <br />to whether to place these funds in one or two separate <br />certificates of deposit. <br />4 ayes - 0 nayes. Motion carried. <br />Motion was made by Jankowski, seconded by Weaver, to ACCEPT <br />THE TREASURER'S REPORT AS PRESENTED. <br />4 ayes - 0 nayes. Motion carried. <br />PAYMENT OF BILLS <br />Weaver addressed the most recent billing from Barr Engineer- <br />ing in the amount of $1,307.17 for professional services <br />during the period December 29, 1991, through February 29, <br />1992. The Table 1 itemization attached to the bill indicates <br />nearly all of the bill was charged against Department of <br />Natural Resources permit reviews. Weaver stated, however, <br />the permit work portion of the bill should be broken down <br />further so the LRRWMO and its financial officer can identify <br />where we charge those fees. <br />Weaver expressed the added wish that municipalities not <br />direct unnecessary telephone calls to our Consulting <br />Engineer, for which this board must pay. <br />Schultz stated conversations municipalities feel necessary to <br />have with the Consulting Engineer about a specific project <br />should be charged against the project funds. Weaver <br />indicated then the Consulting Engineer must identify them <br />accordingly. <br />Jankowski indicated, upon review of this bill itemization, he <br />recalled the Consulting Engineer broke it down better in the <br />past. Schultz concurred, adding it has been the consensus of <br />the board that the Consulting Engineer was to be clearer on <br />these bills. He felt the majority of this bill was probably <br />due to the Ramsey project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.