My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes from 1992
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
LRRWMO
>
Minutes
>
Minutes from 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:31:09 PM
Creation date
4/14/2010 10:08:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Lower Rum River Water Management Organization
Document Date
12/17/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LRRWMO Meeting Minutes <br />August 20, 1992 <br />Page 2 <br />have been cut. However, at the direction of this board, <br />those checks have not been mailed out, awaiting the receipt <br />of revised, detailed billings from Barr Engineering. Knutson <br />indicated Barr Engineering has not been paid since December <br />1, 1991. These unpaid bills total approximately $1,669.50. <br />He reported it was the recommendation of the Bill Review <br />Committee to show these outstanding payments on the budget <br />report in order to get a proper reflection of cash on hand. <br />This will be done on the report received next month. <br />Upon further discussion of the non - detailed Barr Engineering <br />bills being held, Knutson stated that before November 30, <br />1991, Barr Engineering was providing sufficiently detailed <br />bills. However, for some reason that practice was changed. <br />Weaver asked that the minutes reflect that the reason these <br />Barr Engineering bills have not been paid is that these <br />billings do not differentiate between permit reviews and Barr <br />Engineering's general billings to this organization for time. <br />Knutson also provided the board with a Summary of Permit Fee <br />Applications for the period ending June 30, 1992, totaling <br />$2,677.00. <br />Motion was made by Jankowski, seconded by Weaver, to ACCEPT <br />THE TREASURER'S REPORT AS PRESENTED. <br />4 ayes - 0 nayes. Motion carried. <br />PAYMENT OF BILLS <br />Knutson presented a bill from Barr Engineering for the period <br />May 21 through June 27, 1992, in the amount of $520.50; again <br />without providing the proper, requested, itemized breakdown <br />of costs. <br />Schrantz recalled the discussions at the June 25, 1992, <br />special meeting with Barr Engineering representatives John <br />Dickson and Dean Skallman whereby Mr. Dickson indicated he <br />could easily provide the requested information on a worksheet <br />which Barr Engineering would put together. Knutson indicated <br />he would call Skallman and remind him. Weaver asked Knutson <br />to remind Skallman that the LRRWMO is waiting to pay these <br />previously submitted bills. <br />Knutson further explained that there are permit expenses in <br />these billings from Barr Engineering that have to come out of <br />the application fees. Some of these projects are soon to be <br />finished and will require a return of the unused funds. <br />Therefore, it is mandatory that those unpaid bills from Barr <br />Engineering be properly delineated in the very near future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.