Laserfiche WebLink
II. Proposed Improvements and Project Costs <br />Anoka County feels that the proposed improvements to this intersection will result in an <br />increase in intersection safety. The proposed improvements will provide for increased driver <br />reaction time at CR 27 and decrease the probability for crashes related to sight distance. <br />Preliminary cross section drawings in the appendix of this submittal show that without the <br />purchase of additional right of way and significant earthwork, the profile of TH 47 approaching <br />CR 27 can be lowered by 2.50 feet resulting in a vertical profile that meets 55 mph stopping <br />sight distance and increases intersection safety significantly (see plan profile in appendix. The <br />preliminary construction limits can be seen in figure 2 in the appendix of this submittal. <br />The proposed geometrics have maximized the use of the existing pavement, while minimizing <br />the effects on property owners living nearby therefore minimizing construction costs and <br />homeowner concerns. The improvements as shown on the layout included in the appendix, is <br />estimated to be approximately $249,322 for total construction. Anoka County will not <br />participate in the construction costs for the improvements along TH 47 but will provide in- <br />housedesign and construction services. Arioka County is requesting Mn/DOT participation in <br />the amount of $249,322 for construction and $19,946 for engineering and administration for a <br />grand total of $269,268 in the FY2010 Cooperative Agreement Program. <br />County of Anoka ,, <br />Cooperative Agreement Submittal <br />T.H. 47 / C.R. 27 ~~~ <br />