My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes from 1995
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
LRRWMO
>
Minutes
>
Minutes from 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:31:40 PM
Creation date
5/10/2010 11:38:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Lower Rum River Water Management Organization
Document Date
12/21/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LRRWMO Meeting Minutes <br />June 15, 1995 <br />Page 10 <br />Motion was made by .Haas, seconded by Weaver, to approve the revised erosion and <br />sediment control plan for LRRWMO Permit #95-9, First Team Sports, with the notation <br />that a NPDES construction permit may also be required from the MPCA. Vote: 4 ayes, <br />0 nays. Motion tamed. <br />LRRWMO Permit #95-10 -Central Power Distnbution <br />Jankowski reviewed the June 13, 1995 memorandum from Beduhn indicating he has <br />reviewed the revised erosion and sediment control plan for the Central Power Distnbutors, <br />Inc. facility, believes it contains appropriate erosion and sediment control practices, and <br />meets the requirements of the LRRWMO. The memorandum also notes the possible need <br />for a NPDES construction permit from the MPCA. <br />Central Power Distributors, Inc. reviewed his permit <br />to construct an office/wazehouse distnbution facility on Lot 3 and 3A, Block 3 of the Anoka <br />Enterprise Pazk Third Addition. He advised the erosion and sediment control plan has been <br />designed by Hakanson Anderson so his firm became involved to avoid a possible conflict of <br />interest with Hakanson reviewing a plan they designed themselves. <br />Motion was made by Haas, seconded by Ferguson, to approve the revised erosion and <br />sediment control plan for LRRWMO Permit #95-10, Central Power Distribution, with the <br />notation that a NPDES construction permit may also be required from the MPCA. Vote: <br />4 ayes, 0 nays. Motion carried. <br />WCA Permitting Procedures (when a Replacement Plan is involved <br />The LRRWMO reviewed the May 26, 1995 memorandum from Beduhn reviewing the. <br />permitting procedures to be used when a replacement plan is involved. It was noted that <br />to avoid additional costs, the LRRWMO will now require four complete copies of the plans <br />and supporting documents. <br />Consensus was reached to approve the Replacement Plan procedures as proposed by <br />Beduhn. <br />Updated Permit Requirement/Application Forms <br />The LRRWMO reviewed the updated Permit Requirement and Application Forms which <br />now require four complete sets of submittals for Replacement Plans. <br />Consensus was reached to approve the revised forms as submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.