Laserfiche WebLink
J- . <br />LRRWMO Meeting Minutes <br />February 15, 1996 <br />Page 8 <br />spacing between posts should be four-foot on center rather than eight-foot as shown on <br />the erosion control detail. <br />2. At the entryways onto the site, rock filter dikes being a minimum of two feet in height <br />and having a maximum side slope of 4:1 must be constructed. These rock filter dikes <br />will enable construction traffic to enter the site and also provide an erosion control <br />facility. The rock dikes must be continually maintained during the construction phase <br />of the project. <br />4. Street sweeping must be undertaken and completed on an as-needed basis. <br />5. Upon completion of construction and restoration of disturbed areas, the permit <br />applicant is responsible for the removal of all erosion control measures installed <br />throughout the site. <br />6. The water quality basins must be constructed at the initial stages of construction and <br />be functional during the site grading portion of the project. <br />Vote: 4 ayes, 0 nays. Motion carried. <br />ADJOURNMENT <br />A motion was made by Weaver, seconded by Haas, to adjourn the meeting. Vote: 4 ayes, 0 nays. <br />Motion carried. <br />Time of adjournment: 10:05 a.m. <br />Respectfully submitted, <br />Cazla With <br />Administrative Secretary <br />• <br />• <br />U <br />./h~ _ <br />