Laserfiche WebLink
LRRWMO Meeting Minutes • <br />September 19, 1996 <br />Page 6 <br />3. The outlet from the ponding basin must be designed to provide skimming of floatable <br />materials. <br />4. At the entryway on the site, a rock filter dike, being a minimum of two feet in height <br />and having maximum side slopes of 4:1, must be constructed. This rock filter dike will <br />provide an erosion control facility but enable construction traffic to enter the site. The <br />rock filter dike must be continually maintained during the construction phase of the <br />project. <br />5. Street sweeping must be undertaken and completed on an as-needed basis. <br />Vote: 4 ayes, 0 nays. Motion carried. <br />LRRWMO Permit #96-13. Vision-Ease Lens - Ramsev <br />The LRRWMO reviewed the September 18, 1996 memorandum from Barr Engineering regarding <br />his review of LRRWMO Permit #96-13 for the construction of a 150,000 squaze foot <br />officeJwazehouse building for Vision-Ease to be located south of Sunwood Drive and north of Jasper <br />Street in Ramsey. <br />Jankowski stated the size of the building is about one-half as large as the AEC building, and is a fairly • <br />large development. Weaver inquired regarding soil conditions and wetland encroachment. Jankowski <br />displayed a site plan and drawing, and reviewed the site configuration and direction of storm water <br />which will be directed to basins in Sunwood Drive and then to a regional sedimentation pond that <br />overflows into a wetland which has no outlet. However, an outlet is planned which go into a series <br />of storm water pipes, ponds, and discharge down Sunfish Lake Boulevazd and into the Ivfississippi <br />River. <br />Motion by Weaver, seconded by Ferguson, to approve LRRWMO Permit. #96-13, Vision-Ease, <br />to construct a 150,000 square foot officelwarehouse building (with a total of 120,000 additional <br />square feet for future expansion) south of Sunwood Drive and north of Jasper Street in <br />Ramsey, conditioned on: <br />1. All erosion control measures shown on the plan must be installed at the initial stages <br />of construction and be maintained until all areas altered have been restored. <br />2. The water quality basin must be constructed at the initial stages of construction and <br />be functional during the site grading portion of the project. <br />3. The outlet from the ponding basin must be designed to provide skimming of floatable <br />materials. <br />4. At the entryway on the site, a rock filter dike, being a minimum of two feet in height <br />and having maximum side slopes of 4:1, must be constructed. This rock filter dike will • <br />provide an erosion control facility but enable construction traffic to enter the site. The <br />rock filter dike must be continually maintained during the construction phase of the <br />project. <br />5. Street sweeping must be undertaken and completed on an as-needed basis. <br />