Laserfiche WebLink
LRRWMO Meeting Minutes • <br />May 15, 1997 <br />Page 8 <br />7. ` The fitting within' the wetland area for the driveway must be field inspected by the <br />Anoka Conservation District to ensure that the wetland encroachment is less than 5,000 <br />square feet meeting the deminimus exemption of the Wetland Conservation Act. <br />Vote: 4 ayes, 0 nays. Motion carried. <br />LRRWMO Permit #97-07 -Tower Pond 3rd Addition -Anoka <br />The LRRWMO reviewed the memorandum from Obermeyer dated May 13, 1997 indicating his <br />review of LRRWMO Permit #97-07 from Tiller Corporation for the installation of a storm sewer <br />system between Lots 18 and 19, Block 1, of the Tower Pond 3rd Addition in Anoka. This system <br />is shown to dischazge into awetland/water quality azea that was constructed in 1992 as part of the <br />original project approved by the L]tRWMO. The storm sewer system provides the outlet for a <br />roadway low point along Edith Patch Drive. This low point functions as a ponding basin for high <br />intense rainstorm events. It is recommended that the storm sewer, C.B.16-C.B. 14 to the system <br />outlet, and/or combination of pipe and overflow capacity be designed to convey the critical 100-yeaz <br />frequency dischazge at this low point. The elevation where water can enter a structure must be a <br />minimum of one foot above the surface overflow, if sufficient pipe capacity is not provided. • <br />Jankowski reviewed Obermeyer's indication this project meets the requirements of the LRRWMO <br />and recommendation for approval subject to five conditions. <br />Schultz explained this is a continuation of the original Tower Pond project and grading is completed. <br />Jankowski inquired regarding submittal of the revised storm water computation <br />Dale Hamilton, Tiller Corporation, stated they are routine calculations for the overflow. Chazlie <br />Pfeiffer, Tiller Corporation, added everything was approved under the original application but since <br />there was a two yeaz lag, Schultz asked them to resubmit. <br />Motion by Haas, seconded by Ferguson, to approve LI2RWM0 Permit 97-07, Tower Pond 3rd <br />Addition, Anoka, subject to the following conditions: <br />1. The erosion control measures must be constructed at the initial stages of construction <br />and be maintained until all areas altered on the site have been restored. <br />2. At the entryway on to the site, rock filter dikes being a minimum of two feet in height <br />and having maximum side slope of four to one must be constructed. These rock filter <br />dikes will- enable construction traff-c to enter the site and also provide an erosion <br />control facility. The rock dikes must be continually maintained during the construction <br />phase of the project. An additional rock dike must be installed at the driveway <br />entryway from this site to Lot 4. <br />3. Street sweeping must be undertaken and completed on an as needed basis. <br />