Laserfiche WebLink
• LRRWMO Meeting Minutes <br />May 15, 1997 <br />Page 9 <br />4. Upon completion of construction and restoration of disturbed areas, the permit <br />applicant is responsible for the removal of all erosion control measures installed <br />throughout the site. <br />5. The LRRWMO will require that the storm sewer and/or combination of pipe and <br />overflow capacity from C.B. 16 to the system outlet be designed to convey the critical <br />100-year frequency discharge from the roadway low point. The low point functions as <br />a ponding basin for the high intense rainstorm events. The elevation where water can <br />eater a structure must be a minimum of one foot above the surface overflow elevation, <br />if sufficient pipe capacity is not provided. A revised storm sewer plan, computations, <br />and detail for the overflow must be submitted to the LRRWMO engineering advisor <br />for review and approval. <br />Vote: 4 ayes, 0 nays. Motion carried. <br />ADJOURNMENT <br />• A motion was made by Weaver, seconded by Ferguson, to adjourn the meeting. Vote: 4 ayes, 0 nays. <br />Motion carried. Time of adjournment: 10:08 a.m. <br />Respectfully submitted, <br />Cazla Wirth <br />Administrative Secretary <br />LJ <br />