Laserfiche WebLink
TABLE V-10 <br />Mttrapolitan Caafeil of the Twin Cities <br />RaBional Syftew Reliever Airports Study <br />CRYSTAL AIRPORT <br />IMPLEMENTATION PLAN <br />AIRPdtT OPERATION CXARAi <br /><Pa9e 3 of 3) <br />DEVELOPMENT COSTS <br />Short•Tars ithroufh 1993) toed/ Loeel/ <br />Ite~ Total Federal State Public Prtwee <br />Electrical Modifleatiansr f3S0,000 f31S,000 f3S,000 <br />Fwl Tart Replece~wKl (25,000 (16,500 f6,S00 <br />Mdnteraxrce euildirq~ f250,000 f16S,000 (65,000 <br />Pevesrnt RMabilitstianr f750,000 Si3S,000 515,000 <br />Terainal/Adain Eapwian f166,S50 (766,550 <br />0•Brite Radar f150,000 5150,000 <br />Total Oewlapsrnt Cost f7,113,550 f600,000 5181,500 f1i3,500 i788,S50 <br />Mid-Teri lthrouBh 1996) Local/ Local/ <br />ItM Total Fedsrel State PVblte Privets <br />Pevasent Rehabilitatianl f450,000 f297,000 f153,000 <br />Total Dawlopwsnt Cwt fiS0,000 f0 (297,000 fiS3,000 f0 <br />Larq•Tena <throueh 2006) Lain/ Local/ <br />Ita~ Totd faderd Stets Public Private <br />Itinerant Resp 1117,500 f10S,750 (11,750 <br />Total Dewlopaent Cost f117,500 5105,750 f0 (71,750 SO <br />r, <br />~ Project reeerarded in M11C Capital laproveorit Plen. <br />v-n <br />