My WebLink
|
Help
|
About
|
Sign Out
Home
FAA Regulations
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
FAA Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 3:58:21 PM
Creation date
5/12/2010 11:45:08 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AC 150/5900-1B 1/31/79 <br />(13) Airport access plans to indicate the proposed routing of airport <br />access facilities to central business districts and to points of connection <br />with existing or planned arteries and based on airport access studies which <br />take into account traffic demands, existing and potential access problems, <br />highway and rapid rail facilities, and in -town terminal facilities. <br />(14) Schedules of proposed development to indicate the staging of <br />improvements proposed in the master plan and based on short, intermediate, <br />and long-range forecasts (5, 10, and 20 years) of aviation activity. <br />(15) <br />master plan <br />(16) <br />master plan <br />with annual <br />Estimates of development costs for improvements proposed in the <br />as related to schedules of proposed development. <br />Study of economic feasibility of improvements proposed in the <br />based on comparison of annual costs required to implement the plan <br />revenues available to cover these costs. <br />(17) Preparation of a financial plan for the implementation of <br />proposed improvements based on various means of financing such as general <br />obligation bonds, revenue bonds, taxation, private financing, government <br />assistance, or combinations thereof. <br />(18) Printing of master plan documents including reimbursement for <br />a maximum of 20 copies of preliminary, interim, and drafts of final reports; <br />50 copies of technical versions of final reports; and condensed final reports <br />for public consumption amounting to 200 copies for large hub airports, 150 <br />copies for medium hub airports, and 100 copies for all other airports. (The <br />printing of extra copies will be allowed if adequate justification is <br />provided.) <br />(19) Administration of master plan projects based on reasonable <br />direct and indirect costs incurred by sponsors and guidelines set forth in <br />FAR Part 152 (see Appendix 4 of AC 150/5100-10). <br />(20) Preparation and printing of an approved number of environmental <br />impact assessment reports covering improvements proposed in a master plan <br />and based on the requirements of the National Environmental Policy Act of <br />1969 and current FAA guidelines. <br />(21) Public hearings and public information activities and publica- <br />tions as may be necessary or desirable for consideration by the public of <br />proposed airport site selection or major improvements and based on the <br />requirements of the Airport and Airway Development Act of 1970, as amended <br />(see AC 150/5050-4). <br />8 <br />' Chap 1 <br />Par 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.