My WebLink
|
Help
|
About
|
Sign Out
Home
Metropolitan Sytems Information Statement 1989
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Metropolitan Sytems Information Statement 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:02:47 PM
Creation date
5/13/2010 9:42:18 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U S Department <br />of Transportotton <br />Federal Aviation <br />Administration <br />Great Lakes Region/AGL-530 <br />2300 East Devon Avenue <br />Des Plaines, Illinois 60018 <br />IN REPL REFER TG <br />AERONAUTICAL STUDY <br />No.89-AGL-2415-OE <br />ACKNOWLEDGMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION <br />Mr. Elwyn Tinklenberg <br />Administrator's Office <br />• Anoka County Courthouse <br />o • . 325 East Main Street <br />Anoka, MN 55303 <br />DESCRIPTION <br />CONSTRUCTION <br />PROPOSED <br />Landfill <br />CONSTRUCTION LOCATION <br />PLAGE NAME <br />Ramsey, MN <br />LATITUDE *** LONGITUDE <br />45° 13' 57" 93° 26' 19" <br />HEIGHT (IN FEET( <br />ABOVEGROUND' I ABOVE MSL <br />120 990 <br />The Federal Aviation Administration hereby acknowledges receipt of notice dated December 12, 1989, concerning the <br />proposed construction or alteration descnbed above. <br />A study has been conducted under the provisions of Part 77 of the Federal Aviation Regulations to determine whether the proposed construction <br />would bean obstruction to air navigation. whether it should be marked and lighted to enhance safety in air navigation, and whether supplemental <br />notice of start and completion of construction is required to permit timely charting and notification to airmen. The findings of that study are as <br />follows: <br />❑ The proposed construction does not require a notice to FAA. <br />❑ The proposed construction is not identified as an obstruction under any standard of FAR. Part 77. Subpart C and would not be a <br />hazard to air navigation. <br />❑ The proposed construction is identified as an obstruction under the standardsot FAR. Part 77, Subpart C but would not bea hazard to <br />air navigation. <br />❑ The structure should be obstruction marked and Lighted per FAA Advisory Circular AC 70/7460-1. "Obstruction Marking and <br />Lighting." Chapters <br />❑ Supplemental notice is required at least 48 hours before the start of construction and within five days after construction reaches its <br />greatest height (use the enclosed FAA form). <br />This determination expires on unless: <br />(a) extended. revised or terminated by the issuing office: <br />(b) the construction is subject to the licensing authority of the Federal Communications Commission and an application for a <br />construction permit is made to the FCC on or before the above expiration date. In such case the determination expires on the date <br />prescribed by the FCC for completion of construction. or on the date the FCC denies the application. <br />NOTE. Any request for extension of the effective period of this determination must be postmarked or delivered to the issuing office at least 15 <br />days prior to the expiration date. <br />** fl The proposed construction would exceed Part 77 obstruction standards and further aeronautical study is necessary to determine <br />whether it would be a hazard to air navigation. Pending completion of any further study. it is presumed the construction would be a <br />hazard to air navigation. Further study: <br />0 Has been initiated by the FAA. of the resolution of the objectionable effects. <br />a May be requested by the sponsor within 30 dayslxwlaw4Nluw.:w.awa <br />fl If the proposed structure were reduced in height to not exceed * ft. above ground level ( * ft. above sea level). it would <br />not exeed Part 77 obstruction standards. <br />If the structure is subject to the licensing authority of the FCC. a copy of this acknowledgment will be sent to that Agency. <br />NOTICE IS REQUIRED ANYTIME THE PROJECT IS ABANDONED OR THE PROPOSAL IS MODIFIED. <br />* The proposal exceeds by its'entire height. <br />** See Page 2 for objectionable effects. <br />*** Coordinates based on site marked or>, submittedmap, closest to east/west runway. <br />"enry(. French <br />SIGN <br />I5SUE0 IN <br />Des Plaines, Illinois <br />TITLE Acting Manager. System Mtntaganent ^Branch. AGL-530 <br />(Phone: (312) 694-7568) 33 bb-u <br />ON <br />FAA FORM 7460-7 I4.131 SUPERSEDES PREVIOUS EDITION <br />GPO : 1983 0 - 4I7-5 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.