Laserfiche WebLink
Page 2 <br />April 17, 1985 <br />Assuming the lower number of forecast operations are more accurate, <br />however, does not change the recommended development plan since <br />Gateway is planned as a fundamental basic airport facility. The <br />actual staging of development, however, is dependent on actual need. <br />Comment X <br />A seven day survey was planned to be conducted by the Air Traffic <br />Control students at the A. V. T. I. school Located on the airport. No <br />survey was conducted, however. <br />Comment XI <br />A copy of the Phase I report was submitted to MAC for comments. We <br />are in receipt of those comments and will continue to keep MAC abreast <br />of any plans. <br />Thank you for your review comments. <br />Sincerely, <br />HAKANSON ANDERSON ASSOCIATES, INC. <br />Me~ J. Otto --~~~ <br />/mlc <br />cc: Jack Ippel, Chairman, Ramsey Airport Comm. <br />Mark Ryan, Metro Council <br />File: RA10:01-2 <br />