My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 10/26/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:47:16 PM
Creation date
10/21/2010 2:48:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Plat Review - Ramsey Town Center 12 Addition <br />Final Site Plan Review - Ramsey Medical Building <br />October 26, 2010 <br />Page 4 of 7 <br />• At the time of installation, all shrubs must be at least twenty -four (24) inches in size. <br />• All disturbed areas must be sodded. Any deviation from this condition requires City Council <br />approval. <br />• Should City Council approve the use of seed rather than sod, details will be required outlining <br />application rate(s) and installation method. <br />• Staff supports the use of native grasses; however, it is unclear whether the intent is to mow this <br />area or to let the grasses grow to their natural heights. If it is the later, signage or some other <br />strategy may need to be implemented because, to the untrained eye, native grasses have an <br />appearance of an unmaintained area, which may not be appropriate in The COR. <br />• Please clarify in planting schedule whether it is red oak (Quercus rubra) or northern pin oak <br />(Quercus ellipsoidalis) that is proposed. <br />• Finally, if this project is attempting to eliminate any irrigation of landscaping, some thought <br />should be given to installing curb cuts (or eliminating curbing altogether) around the parking lot <br />islands. The planting area could then be slightly depressed and utilized to capture the storm water <br />runoff, creating a benefit of infiltration while also irrigating those plantings at the same time. <br />The Applicant is responsible for maintenance of all proposed landscaping above and beyond City <br />requirements, including the right -of way. <br />The City has received a revised Landscape Plan dated October 19, 2010. It appears that a majority of the <br />comments above have been addressed. However, Staff has not had adequate time to formalize comments <br />and verify the information submitted. A final review of the Landscape Plan will be provided prior to the <br />City Council meeting. <br />Tree Preservation: This site is devoid of any significant tree cover and therefore, no tree preservation <br />plan is necessary. <br />Engineering Review <br />Reviewer: Tim Himmer, City Engineer <br />thimme,(ci. ramsev. mn. us <br />763 - 433 -9893 <br />Grading and Drainage: The building floor elevation should be set to be above the adjacent grade of the <br />public streets while meeting ADA accessibility guidelines. The grade from the building to the property <br />lines and extending to the limits of the shared accesses must be set to match the plans for the future <br />buildings and parking. <br />The COR Development utilizes regional stormwater ponds for rate control and water quality treatment. <br />Each individual site needs to provide additional water quality treatment through the use of rain gardens, <br />water quality treatment structures, or other BMP's. The plan is proposing to install a conventional system <br />sewer system (inlet structures and pipes) that lead to a single discharge point at the southeast corner of the <br />site. Drainage calculations for both pipe and Stonnceptor sizing have been submitted for review, and <br />comments on this will be formalized prior to the City Council meeting. . Please provide your thought <br />process on considering the incorporation of BMP's into the storm sewer design to reduce runoff, and <br />provide additional treatment. It appears as if opportunities exist to include bioswales and/or raingardens <br />in the turfed area to the east. Incorporating such items could reduce the amount and size of some of the <br />storm sewer structures and pipes. A maintenance agreement will be required for the on -site storm sewer <br />design to ensure regular maintenance and proper functioning of the intended design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.