My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/09/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 11/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:47:37 PM
Creation date
11/4/2010 3:13:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/09/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />Bunker Lake Boulevard Extension <br />City of Ramsey <br />IV. RIGHT-OF-WAY REQUIREMENTS <br />No additional right-of-way is anticipated for the Phase I improvements. Bunker Lake Boulevard <br />will be dedicated through the platting process. The City also previously acquired right-of-way for <br />the sanitary sewer extension along Armstrong Boulevard, and currently owns a segment of right- <br />of-way needed to complete the full right-of-way for Bunker Lake Boulevard. This right-of-way <br />segment along Bunker Lake Boulevard is occupied by private encroachment which will need to be <br />moved by the owner prior to the work. <br />V. PROJECT COSTS <br />The estimated project costs are summarized below. Detailed cost estimates are included in the <br />appendix of this report. Project assessments will be subject to final negotiations with the <br />Petitioner. <br />Costs Summary <br />Oversizing Costs <br />Drainage Oversizing (City Share) <br />Sewer Oversizing (City Share) <br />Water Oversizing (City Share) <br />City Sub -Total <br />Percent of Total <br />$ 53,530 $ - 20.0% <br />$ 167,818 $ - 37.2% <br />$ - $ - 0.0% <br />$ 221,348 <br />Costs to construct Puma Street to a 32 -feet wide road with curb and gutter and full utilities are <br />roughly $320 per foot, or a total cost in the range of $800,000 to $900,000. <br />7 <br />Prepared By: R16.102774 <br />Bolton & Menk, Inc. November 2010 <br />2011 Phase I <br />Future Widening <br />Totals <br />Street and Trail Improvements - Bunker Lake <br />$ <br />666,450 <br />$ <br />790,362 <br />$ <br />1,456,812 <br />Drainage Improvements - Bunker Lake <br />$ <br />267,326 <br />$ <br />35,721 <br />$ <br />303,047 <br />Sanitary Sewer Ext. - Sunwood to Bunker <br />$ <br />135,758 <br />$ <br />- <br />$ <br />135,758 <br />Sanitary Sewer - Bunker Lake <br />$ <br />315,388 <br />Dev. Lateral(s) <br />$ <br />315,388.04 <br />Sanitary Sewer Ext. - Bunker to Fire Station <br />$ <br />106,851 <br />$ <br />- <br />$ <br />106,851.36 <br />Watermain Crossing at Armstrong <br />$ <br />60,033 <br />$ <br />- <br />$ <br />60,032.50 <br />Watermain Extensions - Bunker Lake Blvd <br />$ <br />375,511 <br />Dev. Lateral(s) <br />$ <br />375,511.40 <br />Puma Street Surfacing <br />$ <br />117,049 <br />$ <br />- <br />$ <br />117,049.10 <br />Armstrong Boulevard Trail <br />$ <br />250,000 <br />$ <br />250,000.00 <br />Puma Street Trail <br />$ <br />56,518 <br />$ <br />56,517.84 <br />Project Totals <br />$ <br />2,350,883 <br />S <br />826,083 <br />S <br />3,176,966 <br />Oversizing Costs <br />Drainage Oversizing (City Share) <br />Sewer Oversizing (City Share) <br />Water Oversizing (City Share) <br />City Sub -Total <br />Percent of Total <br />$ 53,530 $ - 20.0% <br />$ 167,818 $ - 37.2% <br />$ - $ - 0.0% <br />$ 221,348 <br />Costs to construct Puma Street to a 32 -feet wide road with curb and gutter and full utilities are <br />roughly $320 per foot, or a total cost in the range of $800,000 to $900,000. <br />7 <br />Prepared By: R16.102774 <br />Bolton & Menk, Inc. November 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.