My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 07/23/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:09:35 AM
Creation date
9/3/2003 1:48:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Plat Wildlife Sanctuary 2"d Addition <br />July t 9, 2002 <br />Page 6 of 8 <br /> <br />Alliant Engineering: Wildlife Sanctuary. 3"~ Addition: <br /> <br />Sheet 4 of i [: <br />· Dimensions of the street is 32' back to back o'fcurb <br /> <br />Sheet 5 of 11: Grading Plan <br />· Provide elevations at all property comers as weI1 as any critical elevations or change of slope <br /> elevations. <br />· Verify tree removal limits not being in conflict w/th retaining wail. <br />· Show all drainage and utility easements on final grading plan. <br />· Verify house styles match those of Wildlife Sanctuary 2"d Additions house style detail. <br /> <br />Sheet 6 of 11: <br />· Match tops of pipes and eliminate drops in CB's and MH's. <br />· Ail pedestrian curb ramps, bituminous and concrete, to receive ADA complaint surface <br /> treatment. <br /> <br />· Ail vertical curves with algebraic difference greater than I% to have a minimum of 100' <br /> length. <br /> <br />Sheet 7 of 11 <br />· Verify casting conformance with Wildlife Sanctuary 2"d Addition <br /> <br />Sheet 8 of l 1 <br />· Ail water and sewer services on sidewalk side of the road shall be stubbed 9 feet into the 10 <br /> foot drainage and utility easement to avoid disturbance of sidewalk upon hook up. <br />· Install hydrant and valve between station 8+00 and 9+00 <br /> <br />Sheet 9 of 11 <br />· Pedestrian ramp detail should be provided for bituminous trail connections. <br /> <br />Sheet 10 of 1 I <br />· Add note that all MH and GV installed outside of street or paved ares to be marked with <br /> green and blue carconite stakes respectively. <br />· Manholes shall have a minimum of 2 adjusting rings and maximum of 5 <br />· All valves shall have valve extensions installed to within 1 foot of finished grade <br />· Utilize a mountable curb casting and eliminate transition to B6/18 curb with all catch basins <br /> (Neenah No R-3508-AZ or approved as equal) <br />· Add note that all manhole and catch basins shall be protected with infishield, or approved, <br /> with minimum thickness of 60ml and installed according to manufacture's recommendations <br /> to control infiltration. <br /> <br />-133- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.