My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 06/25/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:09:16 AM
Creation date
9/3/2003 2:13:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-138- <br /> <br />Final Plat Review: Highlands At River Park 2"a Addition <br />June 20, 2002 <br />Page 2 of 4 <br /> As mentioned at the time of preliminary plat approval, all swales must be protected with <br /> drainage and utility easements. Cross drainage or drainage swales have been observed on <br /> Lot 16, Block 2 and are outside of the drainage and utility easements. This must be corrected <br /> and resubmitted. <br /> <br />A temporary cul-de-sac must be constructed at the end of 155~ Lane NW. This temporary <br />cul-de-sac must have an easement sufficient in size to accommodate snow storage and will <br />expire upon final plat approval for the 3rd addition. <br /> <br />4 <br /> <br />Gradi. ng, Drainage and Erosion Control Plan: In an effort to continue with grading into the <br />Third Addition, the Developer has submitted the Final Grading Plan for both additions to <br />balance the soil on site. Tke following comments are general in nature and are relevant to <br />both submittals. <br /> <br />The approval of the final grading plans on the Third Addition does not constitute approval on <br />anything but grading activities. All,pipe and utility construction will be considered at the <br />tkne of final plat approval ~br the 3"° Addition. However, any storm sewer pipe needed to <br />facilitate the grading activities for the 3rd addition must be installed at the Developer's risk to <br />protect e,,dsting homes. Additionally, the Developer will be required to put up a letter of <br />credit sufficient in size to complete the required storm sewer improvements. This letter of <br />credit must be large enough to cover the cost of construction and land acquisition unless a <br />separate recordable document is prepared dedicating the easements necessary to facilitate the <br />construction of the storm sewer pipes proposed on the Grading Plan for the 3rd Addition. The <br />letter of credit must also be sufficient in size to account for complete turf establishment on <br />the site with 4 inches of topsoil and seed. Any grade changes necessary during final plat <br />approval will be done at the Developer's expense. <br /> <br />Critical elevations and or change of slope elevations must be shown on each lot on the final <br />grading plans. These breakpoint elevations are necessary to evaluate the City Code <br />requirement of lots with less than 2% providing a Certificate.of Grading prior to the issuance <br />of a Certificate of Occupancy. These elevations shall be shown On the revised final grading <br />plan and this requirement will be reevaluated. Any tots not meeting the 2% requirement shall <br />be designated as needing a Certificate of Grading. <br /> <br />The following comments are specific to the Grading, Drainage, and Erosion Control Plan for <br />the 2na Addition prepared by Westwood Professional Services and dated May 17, 2002. <br /> <br />· Provide a detail of SOG on Sheet 3 of 4. <br />· Outlet between Lots 4 & 5 should be moved to between Lots 5 & 6 to min/mize pond <br /> short circuiting and opposite bank erosion potential. Another option would be. to add an <br /> additional structure and redirect the flow to the south. <br />° Incorrect comer lot elevation on the southwest comer of Lot 2, Block 1. <br />· Incorrect 878 contour on Lot 8, Block 2. <br /> <br />The following comments are specific to the Grading, Drainage and Erosion Control Plan <br />submitted for the 3rd Addition prepared by Westwood Professional Services and dated May <br /> <br /> ! <br /> <br /> I <br /> I <br /> I <br />I' <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.